Network cables and plugs
47
1SVC 440 795 M1100
Network cables and plugs
If possible use the prepared cables CL-LAD.TK002,
CL-LAD.TK003, CL-LAD.TK004.
The first and last stations in the network must each be
terminated with the CL-LAD.TK009 bus termination resistor.
Connecting the power
supply
CL-AC2 power supply
Figure: 29:
AC power supply on the display system
h
For the connection data of device types CL-DC2 with
24 V DC and CL-AC2 with standard voltages of
100 V to 240 V AC, refer to chapter “Technical data”
page 389.
The display system devices run a system test for one
second after the power supply has been switched on.
Either RUN or STOP mode will be activated after this time
depending on the default setting.
N N
L
0.6
x
3.5
x
100
L
N
> 1 A
U
e = 115/230 V
h
50/60 Hz
(85 – 264 V
h
)
I
e = 70 mA 115 V
35 mA 230 V
Attention!
A short current surge will be produced when switching on
for the first time. Do not switch on the CL-AC2 power
supply via reed contacts since these may burn or melt.
Summary of Contents for CL Series
Page 1: ... APPLICATION MANUAL Display system CL range ...
Page 115: ...112 1SVC 440 795 M1100 ...
Page 345: ...342 1SVC 440 795 M1100 ...
Page 427: ...1SVC 440 795 M1100 424 ...