Commissioning
98
1SVC 440 795 M1100
Configuring the interface
for the COM-LINK mode
If you wish to set up point-to-point communication with
another station, this can be done using either the serial
interface or CL-NET. The display system must be provided
with a display and operating unit. The connection must be
configured for this purpose (
Proceed as follows:
X
Connect both stations together.
Use only the original connection cables. The connector
marked POW-Side must be plugged into a display system.
The display system feeds the interface electronics of the
connection line at both ends.
X
Connect the power supply to both stations.
Figure: 73:
Example with both COM stations.
The display base module with the program is the active station and
the second station is then the remote station.
X
Switch on the power supply for both stations.
X
Ensure that both stations have a power supply. The POW
LED must light up or flash. It is only possible to configure
the stations which have an active power supply.
h
Ensure that the other station supports the COM-LINK mode.
POW-Side
Summary of Contents for CL Series
Page 1: ... APPLICATION MANUAL Display system CL range ...
Page 115: ...112 1SVC 440 795 M1100 ...
Page 345: ...342 1SVC 440 795 M1100 ...
Page 427: ...1SVC 440 795 M1100 424 ...