![ABB CL Series Applications Manual Download Page 243](http://html.mh-extra.com/html/abb/cl-series/cl-series_applications-manual_4582243.webp)
Wiring with the display system
240
1SVC 440 795 M1100
Contacts
PT01Q1 to PT32Q1: State of the trigger coil
Coils
PT01T to PT32T: Trigger coils
Memory requirement of the PUT function block
The PUT function block requires 36 bytes of memory plus 4
bytes per constant at the function block input.
PUT diagnostics
The PUT function block only functions if the CL-NET network
is running properly (
individual stations and diagnostics”, page 331).
Function of the PUT function block
Figure: 126:
Operational diagram PUT module
1: Trigger coil
2: Trigger coil contact feedback
3: Send
Pulse width modulation
The display system provides 2 pulse width modulation
function blocks PW01 and PW02. The function blocks are
connected directly to the outputs.
They are assigned as follows:
PW01
r
Q1
PW02
r
Q2
1
2
3
Summary of Contents for CL Series
Page 1: ... APPLICATION MANUAL Display system CL range ...
Page 115: ...112 1SVC 440 795 M1100 ...
Page 345: ...342 1SVC 440 795 M1100 ...
Page 427: ...1SVC 440 795 M1100 424 ...