![ABB AKD-10 Installation And Maintenance Manual Download Page 64](http://html.mh-extra.com/html/abb/akd-10/akd-10_installation-and-maintenance-manual_2063064.webp)
Figure 62
Figure 63
Follow the below circuit diagram to make the connections between the 2k-1 signalling
unit, relay and fans.
Refer Relay diagram & 1SDHOO1000R0524 to identify the terminal marking in circuit
diagram.
Note: U1 & U2 Emax 2 motor operator (120 V~) terminal.
NOTE 1: In the absence of motor or if motor voltage rating is different than 120 V~ ,
connect 120 V* directly to Tl and T2
Wiring Diagram
WavePro 4000A, Fan Control Unit Wiring & Trip unit Programming
instructions
C
Summary of Contents for AKD-10
Page 36: ...11 14 22 21 31 34 42 41 C2 C1 51 54 62 61 71 74 82 81 91 94 02 01 45 48 R1 R2 C ...
Page 38: ...C ...
Page 43: ...NOTES 1 WP WavePro fixed connection point C ...
Page 51: ...ONLY for 3200A Figure 48 Steps in Exploded Views for 3200A WPS 32 WPH 32 WPX 32 C ...
Page 52: ...ONLY for 3200A Figure 49 Steps in Exploded Views for 4000A WPS 40 WPX 40 C ...
Page 53: ...Figure 50 Steps in Exploded Views for 5000A WPS 50 WPX 50 ONLY for 3200A C ...
Page 65: ...Figure 64 Wiring of WP 4000A breaker with FAN control unit C ...
Page 74: ...Figure 75 Figure 76 WPF 16 with special 2500A Fuse WPF 16 2500A Fuse Tang Positions 74 C ...