Check Before Installing
lt must be ensured that the supply power to the
Shack and Saad compartment is turned off/
compartment is denergized for all the incoming
and outgoingcircuits of the LVS prior to any work
being conducted on it.
During the installation and related work on the
equipment, it must be ensured that the operator
is using the prescribed PPE for the specified
tasks
Ensure only qualified personnel install, operate, service, and maintain all electrical
equipment
.
Danger
These breakers are supported on two extendable rails; each breaker has four rollers. Racking
arms on both sides of the breaker frame engage the drawout mechanism pins fastened to
both sides of the compartment.
C
Summary of Contents for AKD-10
Page 36: ...11 14 22 21 31 34 42 41 C2 C1 51 54 62 61 71 74 82 81 91 94 02 01 45 48 R1 R2 C ...
Page 38: ...C ...
Page 43: ...NOTES 1 WP WavePro fixed connection point C ...
Page 51: ...ONLY for 3200A Figure 48 Steps in Exploded Views for 3200A WPS 32 WPH 32 WPX 32 C ...
Page 52: ...ONLY for 3200A Figure 49 Steps in Exploded Views for 4000A WPS 40 WPX 40 C ...
Page 53: ...Figure 50 Steps in Exploded Views for 5000A WPS 50 WPX 50 ONLY for 3200A C ...
Page 65: ...Figure 64 Wiring of WP 4000A breaker with FAN control unit C ...
Page 74: ...Figure 75 Figure 76 WPF 16 with special 2500A Fuse WPF 16 2500A Fuse Tang Positions 74 C ...