Type designation labels ...........................................................................
Type designation label of the supply unit ...................................................
Type designation labels of the supply module and LCL filter module ..................
Type designation keys ............................................................................
Type designation key of the cabinet-installed IGBT supply unit .........................
Type designation key of the IGBT supply module ........................................
Type designation key of the filter module ...................................................
Contents of this chapter ...........................................................................
Electrical safety precautions .....................................................................
General notes ......................................................................................
Printed circuit boards ..........................................................................
Optical components ............................................................................
Checking the insulation of the assembly .......................................................
Measuring the insulation of the drive ........................................................
Measuring the insulation of the input power cable ........................................
Compatibility check - IT (ungrounded) earthing system ......................................
Connecting the input power cables ..............................................................
Connection diagram (frame 1×R8i, limited scope version) ...............................
Connection diagram (frame R8i and multiples) ............................................
Connection procedure (frame R8i, limited scope version) ...............................
Connection procedure (frame R8i and multiples) ..........................................
Checking the settings of transformers T21, T101 and T111 .................................
T21 and T101 tap settings (400…500 V units) .............................................
T21 and T101 tap settings (690 V units) ....................................................
T111 tap settings ...............................................................................
Checking the settings of the cooling fan transformer .........................................
Connecting the control cables for the supply unit .............................................
Default I/O connection diagram ..............................................................
Connection procedure (frame R8i, limited scope version) ...............................
Connection procedure (frame R8i and multiples) ..........................................
Control cable connection procedure .....................................................
Wiring the functional safety oQ951, +Q952, +Q963, +Q964 or +Q979 ..........
Connecting a PC ...................................................................................
Contents of this chapter .......................................................................
Checklist .........................................................................................
Contents of this chapter ...........................................................................
Start-up procedure .................................................................................
Electromagnetic interlocking ..................................................................
Switching off the supply unit and the drive .....................................................
Disconnecting and temporary grounding the drive (including the input power terminals) .
Connecting the drive / supply unit to the power line ..........................................
Powering-up the supply unit / drive ..............................................................
6 Table of contents
Summary of Contents for ACS880-207
Page 1: ... ABB INDUSTRIAL DRIVES ACS880 207 IGBT supply units Hardware manual ...
Page 2: ......
Page 4: ......
Page 53: ... 3 3 Electrical installation 53 11 ...
Page 54: ...3 54 Electrical installation ...
Page 81: ...4 5 6 7 8 6 10 10 Maintenance 81 ...
Page 94: ...5 6 10 3 4 7 9 8 94 Maintenance ...
Page 99: ... Maintenance 99 ...
Page 100: ... 100 Maintenance ...
Page 103: ...5 6 3 4 8 9 7 Maintenance 103 ...
Page 107: ...5 6 3 4 7 Maintenance 107 ...