
5. Measure that the installation is de-energized. If the measurement requires removal or
disassembly of shrouding or other cabinet structures, obey the local laws and regulations
applicable to live working (including – but not limited to – electric shock and arc
protection).
• Before and after measuring the installation, verify the operation of the voltage tester
on a known voltage source.
• Make sure that the voltage between the drive input power terminals (L1, L2, L3) and
the grounding (PE) busbar is zero.
• Make sure that the voltage between the drive output terminals (T1/U, T2/V, T3/W)
and the grounding (PE) busbar is zero.
• Make sure that the voltage between the drive DC terminals (UDC+ and UDC-) and
the grounding (PE) terminal is zero. In cabinet-built drives, measure between the
drive DC busbars (+ and -) and the grounding (PE) busbar.
6. If the drive is not equipped with a grounding switch, install temporary grounding as
required by the local regulations.
7. Ask the person in control of the electrical installation work for a permit to work.
General notes
■
Printed circuit boards
WARNING!
Use a grounding wrist band when you handle printed circuit boards. Do not touch
the boards unnecessarily. The boards contain components sensitive to electrostatic
discharge.
■
Optical components
WARNING!
Obey these instructions. If you ignore them, damage to the equipment can occur.
• Handle the fiber optic cables with care.
• When you unplug the fiber optic cables, always hold the connector, not the cable itself.
• Do not touch the ends of the fibers with bare hands as the ends are extremely sensitive
to dirt.
• Do not bend the fiber optic cables too tightly. The minimum allowed bend radius is 35 mm
(1.4 in).
Electrical installation 47
11
Summary of Contents for ACS880-207
Page 1: ... ABB INDUSTRIAL DRIVES ACS880 207 IGBT supply units Hardware manual ...
Page 2: ......
Page 4: ......
Page 53: ... 3 3 Electrical installation 53 11 ...
Page 54: ...3 54 Electrical installation ...
Page 81: ...4 5 6 7 8 6 10 10 Maintenance 81 ...
Page 94: ...5 6 10 3 4 7 9 8 94 Maintenance ...
Page 99: ... Maintenance 99 ...
Page 100: ... 100 Maintenance ...
Page 103: ...5 6 3 4 8 9 7 Maintenance 103 ...
Page 107: ...5 6 3 4 7 Maintenance 107 ...