2.6 LED Indicator
IES6116 series LED indictors are on the front panel. The function of each LED is described in the table as
below:
System statue LED
LED
Indicator
Description
PWR1~2
(Green)
ON
P1~2 connection regularly
OFF
P1~2 Power supply have no connection or unwonted
Alarm
(Green)
ON
Power, port alarm
OFF
Power, port have no alarm
Run
(Green)
OFF/ON
Device unwonted
Blinking
Blinking 1 time/second, device working steadily
Link1~16
(Green)
ON
Established effective network connection
Blinking
Network in activity statues
OFF
Did not established effective network connection
2.7 Installation
Before installation, confirm that the work environment meet the installation require, including the power
needs and abundant space, whether it is close to the connection equipment and other equipments are
prepared or not.
1. Avoid in the sunshine, keep away from the heat fountainhead or the area where in intense EMI.
2. Examine the cables and plugs that installation requirements.
3. Examine whether the cables be seemly or not (less than 100m) according to reasonable scheme.
4. Screw, nut, tool provide by yourself.
5. Power: DC dual power supply series products 12 ~ 48VDC
AC single power supply series products 100~240VAC/DC
6. Environment: working temperature -40
~
75
℃
Relative humidity 5%
~
95%
DIN-rail installation
In order to apply for industrial environments conveniently,
IES6116 series
adopts 35mm DIN-Rail
installation, the installation steps are as follows:
1. Examine the DIN-Rail accessories
2. Examine DIN Rail is firm or not and the position is suitable or not.
3. Insert the top of the DIN-Rail into the slot just below the stiff metal spring.
4. The DIN-Rail attachment unit will snap into place as shown below.