Installation requirements
Install and start the inverter according to the following instructions. Place the inverter on suitable load-
bearing supports with sufficient load capacity (such as walls or photovoltaic racks) and make sure that the
inverter is positioned vertically. Choose a suitable location for the installation of the electrical equipment.
Make sure there is sufficient space for heat dispersion and to accommodate future maintenance. Maintain
adequate ventilation and ensure that there is enough air circulation for cooling.
Figure 1 – Do not lose or damage this manual
Transport requirements
If you encounter problems with the packaging, or if you find any visible damage, please notify the transport
company immediately. If necessary, request assistance from an installer of photovoltaic systems or from
Zucchetti Centro Sistemi SpA. Transport of the equipment, especially by road, must be carried out with
vehicles suitable to protect the components (in particular, electronic components) against violent knocks,
humidity, vibrations, etc.
Electrical connections
Please pay attention to the electrical regulations on accident prevention when dealing with photovoltaic
inverters.
Before connecting the mains power, be sure to disconnect the photovoltaic
modules by disconnecting all the DC switches of the generator. When exposed
to the sun, the photovoltaic panels produce a voltage that can be dangerous!
Danger