22 / 130
User’s Manual 3PH 10KTL-15KTL-V2
Rev. 1.1 15/03/2021
Identification: MD-AL-GI-00
Rev. 1.1 of 15/03/2021 - Application: GID
3 Metal terminals for
+ DC power cables
3 Metal terminals for
- DC power cables
3 M6 hexagonal screws
6 M8x80 screws and
expansion plugs
1 Warranty Registration
1 user manual
2 warranty
3.3.
Installation tools
The following tools are required for installation of the inverter and electrical connections; therefore, they
must be prepared before installation.
No.
Tool
Function
1
Drill
Recommended drill bit: 8mm
To drill holes in the wall for
fixing the bracket
2
Screwdriver
To screw and unscrew screws for
the various connections
3
Wire stripper
To prepare the cables for wiring