Installation and Operating Instructions V01
11
4.3 Mounting the inverter with the wall bracket
Mounting procedure:
1.
Use the wall bracket as a drilling template and
mark the positions of the drill holes, then drill
4 holes (
Φ
10) to a depth about 70mm. During
operation, keep the drill vertical to the wall,
and hold the drill steady to avoid tilted holes.
2.
After cleaning the dust and other objects from the holes, place 4 wall anchors
into the holes, then attach the wall bracket to the wall using the hexagon head
screw delivered with the inverter.
Risk of injury due to damaged cables
There may be power cables or other supply lines (e.g. gas or water) routed in the wall.
• Ensure that no lines are laid in the wall which could be damaged when drilling holes.
Risk of injury when lifting the inverter, or if it is dropped
The weigh of Evershine is max. 24 kg. There is risk of injury if the inverter is lifted incorrectly
or dropped while being transported or when attaching it to or removing it from the wall
bracket.
• Transport and lift the inverter carefully.
• Two people are needed to mount the inverter.