Z 45/75-90/110
42
Cable routing
www.zepro.com
5.3.1
Main power switch
1. Mount the main switch on a bracket next to controller CD 19 or in any well-protected place with universal
bracket, see Image 61 and Image 62.
IMPORTANT
!
The main switch drainage should always be directed downwards.
2. Connect the main switch cable to the main tail lift current cable quick connector.
3. Connect the main power cable to the second quick connector on the main switch cabling.
4. When installing the main switch and CD 19 controller on the arm attached to the tail lift, route the main
switch and controller cables on the underside of the arm and fasten with cable ties.
5. Pull the main power cable from the main switch to the fuse box/battery plus pole. Prepare the cable with a
cable terminal and shrink hose without connecting. Connection is described later in section 7.
6. Route the controller cabling onwards to the tail lift cable grommet where appropriate. In some cases, the
controller cabling may already be connected at the factory. If not, it can be connected later in section 6.
IMPORTANT
!
The positive cable to the battery and main fuse is connected later in Section
7
, after the cable has been routed/installed.
Image 61. Installation of main
switch to CD 19 controller
Image 62. Installation of main
switch on universal bracket
Image 63. Main power switch
Drainage
Содержание Z 45-90
Страница 2: ......