TWO INCH DEFLECTION ISOLATOR INSTALLATION AND ADJUSTMENT
WASHER
("F")
("B")
GROMMET
("G")
("A")
("C")
("F")
("E")
("E")
("E")
1/4 - 3/8 GAP
CL
CL
("C")
EQUIPMENT
("A")
Read the following instructions before beginning
installation.
1. Isolators are shipped fully assembled and are to be
positioned in accordance with the submittal draw-
ings or as otherwise recommended.
2.
Set isolators on floor, housekeeping pad, or sub-
base, ensuring that all isolator centerlines match
the equipment mounting holes. The VMC group
recommends that the isolator base plates (“B”)
be installed on a level surface. Shim or grout as
required, levelling all isolator base plates to the
same elevation (0.25 of an inch maximum differ-
ence can be tolerated).
3. Bolt or anchor all isolators to supporting structure
utilizing base plate through holes (“C”) or weld
base plate to supporting structure with 0.375" fil
-
let weld 2” long @ 4” on center around entire base
plate or as engineered for specific load and or field
conditions.
4. Isolators are shipped to the job site with (2) re-
movable spacer shims (“E”) between the top plate
and the housing. These shims must be in place
when the equipment is positioned over the isola-
tors.
5. With all shims (“E”) in place, position equipment
on top of plate (“A”) of isolator.
6. Bolt equipment securely to top plate of isolator us-
ing a minimum of 2 x 0.625" UNC A325 GRADE
5 SAE bolts or weld equipment or bracket to the
top plate (“A”) of isolator with a minimum 0.375"
fillet welds 2” long @ 3” O.C. for a minimum to
-
tal weld of 10”. (All sides of equipment or bracket
resting on top plate (“A”) must be welded).
7. The adjustment process can only begin after the
equipment or machine is at its full operating
weight.
8. Back off each of the 4 limit stop lock nuts (“F”) on
the isolators 0.5”.
9. Adjust each isolator in sequence by turning spring
adjusting nuts (“G”) one full clockwise turn at a
time. Repeat this procedure on all isolators, one
at a time. Check the limit stop lock nuts (“F”)
periodically to ensure that clearance between the
washer and rubber grommet is maintained. Stop
adjustment of isolator only when the top plate
(“A”) has risen just above the shim (“E”).
10. Remove all spacer shims (“E”).
11. Fine adjust isolators to level equipment.
12. Adjust all limit stop lock nuts (“F”) per isolator,
maintaining 0.25-to 0.375-inch gap. The limit
stop nuts must be kept at this gap to ensure uni-
form bolt loading during uplift (as the case when
equipment is drained).
Содержание YVAA
Страница 4: ...JOHNSON CONTROLS 4 FORM 201 28 NM1 1 ISSUE DATE 10 12 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 12: ...JOHNSON CONTROLS 12 FORM 201 28 NM1 1 ISSUE DATE 10 12 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 24: ...JOHNSON CONTROLS 24 FORM 201 28 NM1 1 ISSUE DATE 10 12 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 96: ...JOHNSON CONTROLS 96 FORM 201 28 NM1 1 ISSUE DATE 10 12 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 126: ...JOHNSON CONTROLS 126 FORM 201 28 NM1 1 ISSUE DATE 10 12 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 174: ...JOHNSON CONTROLS 174 FORM 201 28 NM1 1 ISSUE DATE 1 31 2018 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 177: ...JOHNSON CONTROLS 177 FORM 201 28 NM1 1 ISSUE DATE 1 31 2018 NOTES...