
JOHNSON CONTROLS
3
FORM 201.28-NM1.1
ISSUE DATE: 1/31/2018
In complying with Johnson Controls’ policy for con-
tinuous product improvement, the information con-
tained in this document is subject to change without
notice. Johnson Controls makes no commitment to
update or provide current information automatical-
ly to the manual or product owner. Updated manu-
als, if applicable, can be obtained by contacting
the nearest Johnson Controls Service office or ac-
cessing the Johnson Controls QuickLIT website at
http://cgproducts.johnsoncontrols.com
.
The Control/VSD Cabinet contains lethal
high AC and DC voltages. Before per-
forming service inside the cabinet, remove
the AC supply feeding the chiller and
verify using a non-contact voltage sensor.
The DC voltage on the VSD DC Bus will
take 5 minutes to bleed off, after AC
power is removed. Always check the DC
Bus Voltage with a Voltmeter to assure
the capacitor charge has bled off before
working on the system.
NEVER short out the DC Bus to dis-
charge the filter capacitors.
NEVER place loose tools, debris, or any
objects inside the Control Panel/VSD
Cabinet.
NEVER allow the Control Panel VSD
Cabinet doors to remain open if there is
a potential for rain to enter the panel.
Keep doors closed and assure all latches
are engaged on each door unless the unit
is being serviced.
ALWAYS lockout the disconnect supply-
ing AC to the chiller.
The 1L Line Inductor will reach operating
temperatures of over 150°C (300°F.) DO
NOT open panel doors during operation.
Assure the inductor is cool whenever
working near the inductor with power
OFF.
It is the responsibility of rigging, lifting, and operat-
ing/ service personnel to verify the applicability of
these documents to the equipment. If there is any ques-
tion regarding the applicability of these documents,
rigging, lifting, and operating/service personnel should
verify whether the equipment has been modified and
if current literature is available from the owner of the
equipment prior to performing any work on the chiller.
CHANGE BARS
Revisions made to this document are indicated with a
line along the left or right hand column in the area the
revision was made. These revisions are to technical in-
formation and any other changes in spelling, grammar
or formatting are not included.
CHANGEABILITY OF THIS DOCUMENT
ASSOCIATED LITERATURE
MANUAL DESCRIPTION
FORM NUMBER
Equipment Pre-Startup and Startup Checklist
201.28-CL2
YVAA Style A Frame Size 015 - 027, 2 Compressor 60 Hz (150-350 Tons)
YVAA Style A Frame Size 054 - 098, 2 Compressor 50 Hz (525-950 KW) Manufactured before April 2012
201.28-RP1
YVAA Style A Frame Size 015 - 052, 2 Compressor 50 & 60 Hz (150-500 Tons)
(Manufactured after April 2012 to before September 2014)
201.28-RP2
YVAA Style B Frame Size 015 - 052, 2 Compressor 50 & 60 Hz (150-500 Tons)
(Manufactured after September 2014)
201.28-RP3
Содержание YVAA
Страница 4: ...JOHNSON CONTROLS 4 FORM 201 28 NM1 1 ISSUE DATE 10 12 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 12: ...JOHNSON CONTROLS 12 FORM 201 28 NM1 1 ISSUE DATE 10 12 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 24: ...JOHNSON CONTROLS 24 FORM 201 28 NM1 1 ISSUE DATE 10 12 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 96: ...JOHNSON CONTROLS 96 FORM 201 28 NM1 1 ISSUE DATE 10 12 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 126: ...JOHNSON CONTROLS 126 FORM 201 28 NM1 1 ISSUE DATE 10 12 2017 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 174: ...JOHNSON CONTROLS 174 FORM 201 28 NM1 1 ISSUE DATE 1 31 2018 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 177: ...JOHNSON CONTROLS 177 FORM 201 28 NM1 1 ISSUE DATE 1 31 2018 NOTES...