![YOKOGAWA ZR22S Скачать руководство пользователя страница 176](http://html1.mh-extra.com/html/yokogawa/zr22s/zr22s_user-manual_3505092176.webp)
<11. Inspection and Maintenance>
11-12
11.3 Replacing Flowmeter in ZR40H Automatic
Calibration Unit
(1) Remove piping and wiring, and remove the ZR40H from the 2B pipe or wall mounting.
(2) Remove four M6 bolts between brackets and remove piping extension
(3) Remove bolts holding flowmeter, and replace it. A white back plate (to make the float easy
to see) is attached. The end of the pin holding down the back plate must be on the bracket
side.
(4) Replace piping, and fix M6 bolts between brackets. *1
*1 : When disassembling and reassembling, mark original positions, and tighten an extra 5-10° when reassembling.
After tightening, do a liquid leakage test.
COM ON S N
Z RO
F11-9E.ai
Bolt fixes bracket
Flowmeter with back plate
Connecter
Figure 11.9 Flowmeter replacement
F11-10E.ai
A
A'
B
B'
C
C'
D
D'
Two screws fix flowmeter
Connect piping pairs A-A', B-B', C-C', D-D'
Figure 11.10 Fixing Flowmeter
IM 11M13A01-02E
Содержание ZR22S
Страница 11: ...Blank Page...
Страница 19: ...Blank Page...
Страница 23: ...Blank Page...
Страница 52: ...2 Specifications 2 29 IM 11M13A01 02E...
Страница 70: ...Blank Page...
Страница 134: ...Blank Page...
Страница 164: ...Blank Page...
Страница 190: ......
Страница 192: ......
Страница 194: ......
Страница 196: ......
Страница 198: ......
Страница 200: ......
Страница 202: ...Blank Page...
Страница 203: ......
Страница 204: ......
Страница 205: ......
Страница 206: ......