
Model YPP6060 Dual-Input Process Meter
Instruction Manual
17
Panel
Gasket
Mounting
Bracket
Mounting
Screw
Removable
Connectors
Figure 2. Panel Mounting Details
Configuration for 12 or 24 VDC Power Option
Do not exceed voltage rating of the selected configuration.
Meters equipped with the 12/24 VDC power option are shipped
from the factory ready to operate from 24 VDC.
To configure the meter for 12 VDC power:
1. Remove all the connectors.
2. Unscrew the back cover.
3. Slide the back cover about 1 inch.
4. Configure the J9 jumper, located behind the power
connector, for 12 V as shown below.
MAIN BOARD
24 VDC
12 VDC
POWER
J9
12 V
24 V
J9 CONFIGURATION
Factory
Default
M-LINK
+
_
Figure 3. Jumper Configuration for 12/24 VDC Power
Содержание YPP6060
Страница 46: ...Model YPP6060 Dual Input Process Meter Instruction Manual 46 Setting the Relay Assignment asSign ...
Страница 73: ...Model YPP6060 Dual Input Process Meter Instruction Manual 73 ...
Страница 100: ...Model YPP6060 Dual Input Process Meter Instruction Manual 100 NOTES ...
Страница 101: ...Model YPP6060 Dual Input Process Meter Instruction Manual 101 Figure 23 1 8 DIN Panel Cutout Template ...
Страница 102: ...Model YPP6060 Dual Input Process Meter Instruction Manual 102 ...
Страница 103: ...Model YPP6060 Dual Input Process Meter Instruction Manual 103 NOTES ...
Страница 104: ...Model YPP6060 Dual Input Process Meter Instruction Manual LIM6060YK_B SFT065 Ver 2 200 up 11 11 ...