Toc-3
IM 01E30D01-01EN
Switching HART Protocol Revision ...................................................8-6
Other operations for the HART configuration tool
.............................8-7
OPERATION VIA HART CONFIGURATION TOOL (HART 7) ................. 9-1
Device Description (DD) on a HART Configuration Tool and
DD Revision and Device Revision .....................................................9-1
Device Type Manager (DTM) and Device Revision ..........................9-2
Interconnection between AXR and HART Configuration Tool
...............................................................................9-3
.................................................................................9-4
Test Output, Simulation, and Squawk ................................................9-4
Trim Analog Output ............................................................................9-5
Multidrop Mode ................................................................................9-10
Switching HART Protocol Revision ................................................. 9-11
Other operations for the HART configuration tool
........................... 9-11
Menu Tree for DD and DTM (HART 7) ...........................................................9-12
Changing Direction of Electrical Connection .............................................. 11-1
Display Unit Replacement ............................................................... 11-2
..................................................................... 11-4
Setting of Burnout Switch ................................................................. 11-5
Setting of Write Protect Switch ........................................................ 11-5
Insulation Resistance Test, Dielectric Strength Test .................................. 11-9
Procedure of Insulation Resistance test .......................................... 11-9
Procedure of Dielectric Strength Test .............................................. 11-9
Unstable Zero .................................................................................11-11
Disagreement Between Indication and Actual Flow ...................... 11-12