i
IM 01E30D01-01EN
Revision Information
Title
:
AXR Two-wire Magnetic Flowmeter Integral Flowmeter
Manual No. : IM 01E30D01-01EN
Edition
Date
Page
Revised Item
1st
Sep. 2009
–
New publication
2nd
Nov. 2010
1-2
(3), (4)
Added the sentence.
3-1
(3)
Added the sentence.
3-7 to 3-12
3.3.2 to 3.3.3
Added the Torque Value of size 150 to 200 mm.
Added the Centering Device Idenfication of size 150 to
200 mm.
Added the Inner Diameters of Grounding
Ring and Outer Diameter for Effective
Sealing of size 150 to 200 mm.
4-2
4.3
Changed the sentence of Wiring Ports.
4-6
4.6 (1)
Added the note of HART protocol.
5-1
5.
Added the sentence
8-5
8.4.6
Corrected the HART protocol parameter attribute.
11-1 to 11-22
11.
Added the sentence of size 150 to 200 mm.
Added the note of OPTIONAL SPECIFICATIONS
Added the Flange material
Added optional code PM
Changed the Selectable range of flow rate span in the
optional code SC.
12-1
12. (1)
Added AXR150G and AXR200G.
13-1 to 13-4
13.1 to 13.3
Changed the item name in Technical Data.
3rd
Aug. 2012
1-1
1.
Changed the style. Changed the Note.
4-1 to 4-15
4.
Changed the Terminal Configuration.
Added the Terminal Configuration.
4-6 to 4-7
4.6 (1)
Changed the Supply Voltage.
Added the Connection Device (JUXTA VJA7)
6-3, 6-11
6.3 (2), (8)
Added "Long Tag No (Hi)" and "Long Tag No (Lo) to Data range
for B41 and H11.
6-6, 6-22
6.3 (4), 6.4 (3)
Changed the default value and the setting value for D13.
6-7, 6-24
6.3 (5), 6.4 (4)
Changed the default value and the setting value for E13.
6-12, 6-32
6.3 (9), 6.4 (8)
Changed the default value and the setting value for J10.
6-46
6.5.3
Added "93:Dcv Sim Wng".
6-46
6.5.4
Added "NE-107"
8-1 to 8-17
8.
Changed HART 5 by the device revision up.
9-1 to 9-18
9.
Added HART 7.
12-1
12.
Changed the Supply Voltage.
Added the Connection Device (JUXTA VJA7)
12-2
Added HART 7.
12-3
Added NE-107
12-3, 12-12
Changed the current output value in case of Style 2 with
optional code C1.
12-3
Changed the default value and the setting value of Low out
12-5 to 12-7
Changed the Accuracy.
12-6
Added SIL Certification.
12-1 to 12-21
Added AXR 150C and AXR200C.
14-1 to 14-10
14.
Added AXR 150C and AXR200C.
A1-1 to A1-3
Appendix 1.
Added "Safety instrumented System Installation"