A-1
183574-1CD
183574-1CD
Appendix A
A.1 Checklist
ArcWorld 50/50S/52/52S
Appendix A
A.1 Checklist
Since our customer is very important to us we include a checklist to use
before start-ups and after maintenance for convenience and safety.
Time/Date
Checked By
BEFORE APPLYING POWER
(Refer to System Drawings)
Check Mounting
(Refer to Installation Section in all Manuals)
Check Power
(Refer to Connections, Controller Manual)
Check Ground
(Refer to Grounding in all Manuals)
Check Water
(Refer to Operation and Vendor Manuals)
Check Air
(Refer to Robot and Vendor Manuals)
Check Gas
(Refer Operation and Vendor Manuals)
Check Interlocks
(Refer to Work Cells in all Manuals)
Check Limiting Devices/Software
(Refer to Limits in all Manuals)
Check Environment
(Refer to Installation in Controller Manual)
Check Version
(Refer to Confirmation of Software Version)
Other Items to Check Before Applying Power
(Vendor or Integrator Supplied)
94 of 126