4-6
ENG
RADIATOR
EC455000
ASSEMBLY AND INSTALLATION
EC445353
Radiator
1. Install:
9
Radiator breather hose
1
9
Radiator hose 2
2
To radiator (right)
3
.
2. Install:
9
Radiator (right)
1
9
Bolt [radiator (right)]
2
9
Radiator hose 4
3
Refer to “CABLE ROUTING DIAGRAM”
section in the CHAPTER 2.
10 Nm (1.0 m•kg, 7.2 ft•lb)
1 Nm (0.1 m•kg, 0.7 ft•lb)
1 Nm (0.1 m•kg, 0.7 ft•lb)
3. Install:
9
Radiator (left)
1
9
Bolt [radiator (left)]
2
9
Radiator hose 1
3
Refer to “CABLE ROUTING DIAGRAM”
section in the CHAPTER 2.
4. Tighten:
9
Clamp (radiator hose 2)
4
5. Install:
9
Panel
1
9
Bolt (panel)
2
NOTE:
Fit the hook
a
on the inner side first into the
radiator.
10 Nm (1.0 m•kg, 7.2 ft•lb)
1 Nm (0.1 m•kg, 0.7 ft•lb)
1 Nm (0.1 m•kg, 0.7 ft•lb)
10 Nm (1.0 m•kg, 7.2 ft•lb)
5NX-9-30-4A 6/5/01 4:12 PM Page 12
Содержание YZ250(P)/LC
Страница 2: ......
Страница 128: ...3 3 INSP ADJ MEMO...
Страница 582: ...TUN MEMO...
Страница 583: ......
Страница 584: ......