2-32
J Position the seat lock cable in-
side under the seat lock bracket.
K Fasten the wireharness to the
frame with a plastic band. Make
sure that the end of band down
ward.
L Route the starter cable between
the throttle cables.
M Fasten the wireharness, starter
cable to the frame with a plastic
band. Make sure that end of ba-
nd down ward.
G Fasten the battery positive (+)
lead and battery positive (+) lead
connector on the groove of the
battery with the battery rubber
band.
H Position the starter motor cable
at 45 degree out side of the mo-
torcycle.
I Position the wireharness, tail-
light lead and rear turn signal
light leads (left and right) be-
tween the taillight bracket and
rear fender rib.
E Connect the fuel sender connec-
tor, neutral switch connector,
pickup coil connector and side-
stand switch connector above
the air filter case.
F Route the battery negative (–)
lead inside of the reservoir tank
bracket and under the reservoir
tank and then connect it.
SPEC
CABLE ROUTING
Содержание XJR1300(L) 99
Страница 1: ......
Страница 2: ......
Страница 8: ......
Страница 10: ...GEN INFO...
Страница 18: ...GEN INFO...
Страница 20: ...SPEC...
Страница 32: ...2 12 SPEC MAINTENANCE SPECIFICATIONS Tightening sequence Cylinder head Crankcase...
Страница 45: ...2 25 1 Camshaft 2 Crankshaft 3 Oil pump 4 Oil filter SPEC LUBRICATION DIAGRAMS...
Страница 56: ...SPEC...
Страница 108: ...CHK ADJ...
Страница 112: ...ENG...
Страница 202: ...CARB...
Страница 282: ...CHAS...
Страница 284: ...ELEC...
Страница 306: ...7 22 CHARGING SYSTEM ELEC 1 2 3 5 Generator Main fuse Battery Main switch EB804000 CHARGING SYSTEM CIRCUIT DIAGRAM...
Страница 330: ...TRBL SHTG...
Страница 336: ...TRBL SHTG...