
2-29
E Fasten the high tension cables
(#1, 2) with a plastic clamp. Posi-
tion the clamp at 50 – 80 mm
above the high tension cable
number.
F Fasten the horn lead to the frame
with a plastic band. Make sure
that the end of band down ward.
G Install the frame ground and ig-
niter unit together with screw.
A Insert the plastic band through
the hole of plastic panel and then
fasten the clutch hose with it.
Make sure that the end of band
inside of motorcycle.
B To headlight lower hole.
C Route the wireharness and start-
er cable through the guide.
D Connect the ignition lead with
white marking tape to the ignition
coil (#1, 4).
1
Clutch hose
2
Starter cable
3
Air filter case drain hose
4 Frame ground
5
Flasher relay connector
6
Oil light relay connector
7
Igniter unit connectors
8
Starter motor
9
AC generator
10
Sidestand switch
11
Sidestand switch lead
12
Ignition coil lead (#1, 4)
SPEC
CABLE ROUTING
Содержание XJR1300(L) 99
Страница 1: ......
Страница 2: ......
Страница 8: ......
Страница 10: ...GEN INFO...
Страница 18: ...GEN INFO...
Страница 20: ...SPEC...
Страница 32: ...2 12 SPEC MAINTENANCE SPECIFICATIONS Tightening sequence Cylinder head Crankcase...
Страница 45: ...2 25 1 Camshaft 2 Crankshaft 3 Oil pump 4 Oil filter SPEC LUBRICATION DIAGRAMS...
Страница 56: ...SPEC...
Страница 108: ...CHK ADJ...
Страница 112: ...ENG...
Страница 202: ...CARB...
Страница 282: ...CHAS...
Страница 284: ...ELEC...
Страница 306: ...7 22 CHARGING SYSTEM ELEC 1 2 3 5 Generator Main fuse Battery Main switch EB804000 CHARGING SYSTEM CIRCUIT DIAGRAM...
Страница 330: ...TRBL SHTG...
Страница 336: ...TRBL SHTG...