4-55
ENG
OIL PUMP
NOTE:
CAUTION:
NOTE:
EAS00375
ASSEMBLING THE OIL PUMP
1. Lubricate:
inner rotor
outer rotor
oil pump shaft
(with the recommended lubricant)
Recommended lubricant
Engine oil
2. Install:
oil pump shaft
1
(to the oil pump cover
2
)
pin
3
inner rotor
4
outer rotor
5
pin
6
oil pump housing
7
screw
Oil pump housing screw
10 Nm (1.0 m
kg)
When installing the inner rotor, align the pin
3
in the oil pump shaft with the groove on the inner
rotor
4
.
3. Check:
oil pump operation
Refer to “CHECKING THE OIL PUMP”.
EAS00376
INSTALLING THE OIL PUMP
1. Install:
oil pump
1
Oil pump bolt
10 Nm (1.0 m
kg)
After tightening the bolts, make sure that the
oil pump turns smoothly.
Align the arrow
a
on the oil pump with the arrow
b
on the crankcase.
Содержание XJR1300(L) 99
Страница 1: ......
Страница 2: ......
Страница 8: ......
Страница 10: ...GEN INFO...
Страница 18: ...GEN INFO...
Страница 20: ...SPEC...
Страница 32: ...2 12 SPEC MAINTENANCE SPECIFICATIONS Tightening sequence Cylinder head Crankcase...
Страница 45: ...2 25 1 Camshaft 2 Crankshaft 3 Oil pump 4 Oil filter SPEC LUBRICATION DIAGRAMS...
Страница 56: ...SPEC...
Страница 108: ...CHK ADJ...
Страница 112: ...ENG...
Страница 202: ...CARB...
Страница 282: ...CHAS...
Страница 284: ...ELEC...
Страница 306: ...7 22 CHARGING SYSTEM ELEC 1 2 3 5 Generator Main fuse Battery Main switch EB804000 CHARGING SYSTEM CIRCUIT DIAGRAM...
Страница 330: ...TRBL SHTG...
Страница 336: ...TRBL SHTG...