2-27
I Fasten the high tension cables
and throttle cables with a plastic
clamp.
J Route the air ventilation hoses,
air filter case drain hose, fuel
tank drain hose and fuel tank bre-
ather hose through the engine
guide.
K Fasten the AC generator lead,
pick-up coil lead, sidestand swi-
tch lead and starter motor cable
with a plastic band.
F Fasten the wireharness to the
frame with a plastic band. Make
sure that the end of band down
ward.
G Insert the plastic band through
the hole of plastic panel and then
fasten the throttle cables with it.
Make sure that the end of band
inside of motorcycle.
H Fasten the wireharness to the
frame with a plastic band. Make
sure that the end of band down
ward.
D Route the wireharness and start-
er motor cable in front of the res-
ervoir tank bracket and the bat-
tery negative (–) lead behind the
reservoir tank bracket. And fas-
ten them with a plastic band.
E Fasten the wireharness, neutral
lead, sidestand switch lead, pick-
up coil lead, AC generator lead
and rear brake switch lead to the
frame with a plastic band. Make
sure that the end of band forward
of motorcycle.
SPEC
CABLE ROUTING
Содержание XJR1300(L) 99
Страница 1: ......
Страница 2: ......
Страница 8: ......
Страница 10: ...GEN INFO...
Страница 18: ...GEN INFO...
Страница 20: ...SPEC...
Страница 32: ...2 12 SPEC MAINTENANCE SPECIFICATIONS Tightening sequence Cylinder head Crankcase...
Страница 45: ...2 25 1 Camshaft 2 Crankshaft 3 Oil pump 4 Oil filter SPEC LUBRICATION DIAGRAMS...
Страница 56: ...SPEC...
Страница 108: ...CHK ADJ...
Страница 112: ...ENG...
Страница 202: ...CARB...
Страница 282: ...CHAS...
Страница 284: ...ELEC...
Страница 306: ...7 22 CHARGING SYSTEM ELEC 1 2 3 5 Generator Main fuse Battery Main switch EB804000 CHARGING SYSTEM CIRCUIT DIAGRAM...
Страница 330: ...TRBL SHTG...
Страница 336: ...TRBL SHTG...