
4-6
ENG
ENGINE
NOTE:
EAS00192
INSTALLING THE ENGINE
1. Tighten the bolts in the following order.
Bolt
1
:
88 Nm (8.8 m
kg)
Bolt
2
:
48 Nm (4.8 m
kg)
Bolt
3
:
55 Nm (5.5 m
kg)
Bolt
4
:
30 Nm (3.0 m
kg)
Bolt
5
:
64 Nm (6.4 m
kg)
Nut
6
:
64 Nm (6.4 m
kg)
2. Install:
shift arm
1
Align the punch mark
b
in the shift shaft with
the punched mark
a
on the shift arm.
Align the bottom edge of the shift pedal with
the mark on the frame-to-swingarm bracket.
Shift arm bolt
10 Nm (1.0 m
kg)
Содержание XJR1300(L) 99
Страница 1: ......
Страница 2: ......
Страница 8: ......
Страница 10: ...GEN INFO...
Страница 18: ...GEN INFO...
Страница 20: ...SPEC...
Страница 32: ...2 12 SPEC MAINTENANCE SPECIFICATIONS Tightening sequence Cylinder head Crankcase...
Страница 45: ...2 25 1 Camshaft 2 Crankshaft 3 Oil pump 4 Oil filter SPEC LUBRICATION DIAGRAMS...
Страница 56: ...SPEC...
Страница 108: ...CHK ADJ...
Страница 112: ...ENG...
Страница 202: ...CARB...
Страница 282: ...CHAS...
Страница 284: ...ELEC...
Страница 306: ...7 22 CHARGING SYSTEM ELEC 1 2 3 5 Generator Main fuse Battery Main switch EB804000 CHARGING SYSTEM CIRCUIT DIAGRAM...
Страница 330: ...TRBL SHTG...
Страница 336: ...TRBL SHTG...