1 - 15
GEN
INFO
STARTING AND BREAK-IN
BREAKING IN AFTER REPLACEMENT
After a part is replaced with a new one, it is
necessary to break it in as in a new machine.
This is required especially when the following
engine-related parts are replaced.
●
Cylinder
●
Piston
●
Piston ring
●
Valve
●
Camshaft
●
Crankshaft
●
Clutch
●
Transmission gear
●
Shift fork
*
For warming up and inspection during
break-in, refer to “GENERAL INSPECTION
AND MAINTENANCE” section in the
CHAPTER 3 and if there is any problem,
stop the engine immediately and check.
Содержание TT-R125E(W)
Страница 2: ......
Страница 14: ...MEMO ...
Страница 64: ......
Страница 67: ......
Страница 69: ......
Страница 70: ...1 2 3 4 5 6 7 8 9 0 6 6 C B D F G E A B C D E F G J K L M N H ...
Страница 112: ...3 40 INSP ADJ Charging method using a variable voltage charger BATTERY INSPECTION AND CHARGING TT R125E TT R125LWE ...
Страница 113: ...3 41 INSP ADJ Charging method using a constant voltage charger BATTERY INSPECTION AND CHARGING TT R125E TT R125LWE ...
Страница 116: ...INSP ADJ FUSE INSPECTION TT R125E TT R125LWE ...
Страница 139: ...4 23 ENG CAMSHAFT AND ROCKER ARMS 5 Install Camshaft bearing holder 1 Bolt 2 T R 10 Nm 1 0 m kg 7 2 ft lb LT ...
Страница 288: ......