6 - 5
–
+
ELEC
IGNITION SYSTEM
ENGINE STOP SWITCH INSPECTION
TT-R125/TT-R125LW
1. Inspect:
●
Engine stop switch conduct
Not continuous while being pushed
→
Replace.
Continuous while being freed
→
Replace.
TT-R125E/TT-R125LWE
1. Inspect:
●
Engine stop switch conduct
No continuous while being pushed
→
Replace.
Continuous while being freed
→
Replace.
Tester (+) lead
→
Black/White lead
1
Tester (–) lead
→
Black lead
2
B/W
1
B
2
Tester selec-
tor position
PUSH IN
Ω
×
1
FREE
Tester (+) lead
→
Black lead
1
Tester (–) lead
→
Black lead
2
B
1
B
2
Tester selec-
tor position
PUSH IN
Ω
×
1
FREE
B
B
1 2
EC626002
IGNITION COIL INSPECTION
1. Inspect:
●
Primary coil resistance
Out of specification
→
Replace.
Tester (+) lead
→
Orange lead
1
Tester (–) lead
→
Black lead
2
Primary coil
resistance
Tester selector
position
0.18 ~ 0.28
Ω
at
20 ˚C (68 ˚F)
Ω
×
1
Содержание TT-R125E(W)
Страница 2: ......
Страница 14: ...MEMO ...
Страница 64: ......
Страница 67: ......
Страница 69: ......
Страница 70: ...1 2 3 4 5 6 7 8 9 0 6 6 C B D F G E A B C D E F G J K L M N H ...
Страница 112: ...3 40 INSP ADJ Charging method using a variable voltage charger BATTERY INSPECTION AND CHARGING TT R125E TT R125LWE ...
Страница 113: ...3 41 INSP ADJ Charging method using a constant voltage charger BATTERY INSPECTION AND CHARGING TT R125E TT R125LWE ...
Страница 116: ...INSP ADJ FUSE INSPECTION TT R125E TT R125LWE ...
Страница 139: ...4 23 ENG CAMSHAFT AND ROCKER ARMS 5 Install Camshaft bearing holder 1 Bolt 2 T R 10 Nm 1 0 m kg 7 2 ft lb LT ...
Страница 288: ......