4 - 65
ENG
7. Install:
●
Crankcase cover (left)
8. Connect:
●
Neutral switch lead
1
NOTE:
Pass the neutral switch lead into the crank-
case cover groove as shown.
9. Connect:
●
CDI magneto lead
Refer to “CABLE ROUTING DIAGRAM”
section in the CHAPTER 2.
CDI MAGNETO AND STARTER CLUTCH
(TT-R125E/TT-R125LWE)
Содержание TT-R125E(W)
Страница 2: ......
Страница 14: ...MEMO ...
Страница 64: ......
Страница 67: ......
Страница 69: ......
Страница 70: ...1 2 3 4 5 6 7 8 9 0 6 6 C B D F G E A B C D E F G J K L M N H ...
Страница 112: ...3 40 INSP ADJ Charging method using a variable voltage charger BATTERY INSPECTION AND CHARGING TT R125E TT R125LWE ...
Страница 113: ...3 41 INSP ADJ Charging method using a constant voltage charger BATTERY INSPECTION AND CHARGING TT R125E TT R125LWE ...
Страница 116: ...INSP ADJ FUSE INSPECTION TT R125E TT R125LWE ...
Страница 139: ...4 23 ENG CAMSHAFT AND ROCKER ARMS 5 Install Camshaft bearing holder 1 Bolt 2 T R 10 Nm 1 0 m kg 7 2 ft lb LT ...
Страница 288: ......