5 - 68
CHAS
EC585000
ASSEMBLY AND INSTALLATION
Bushing
1. Install:
●
Bushing
1
NOTE:
Install the bushing by pressing.
Installation
1. Install:
●
Rear shock absorber assembly
On frame.
NOTE:
Install the rear shock absorber assembly with its
warning label
a
facing left side of the machine
(for TT-R125/TT-R125E/TT-R125LW).
2. Install:
●
Bolt (rear shock absorber assembly -
frame)
●
Plain washer
1
●
Nut (rear shock absorber assembly -
frame)
2
NOTE:
Apply the molybdenum disulfide grease on the
bolt (rear shock absorber assembly - frame).
T
R
.
.
53 Nm (5.3 m · kg, 38 ft · lb)
3. Install:
●
Bolt (rear shock absorber assembly -
relay arm)
●
Plain washer
1
●
Nut (rear shock absorber assembly -
relay arm)
2
NOTE:
Apply the molybdenum disulfide grease on the
bolt (rear shock absorber assembly - relay
arm).
T
R
.
.
35 Nm (3.5 m · kg, 25 ft · lb)
REAR SHOCK ABSORBER ASSEMBLY
Содержание TT-R125E(W)
Страница 2: ......
Страница 14: ...MEMO ...
Страница 64: ......
Страница 67: ......
Страница 69: ......
Страница 70: ...1 2 3 4 5 6 7 8 9 0 6 6 C B D F G E A B C D E F G J K L M N H ...
Страница 112: ...3 40 INSP ADJ Charging method using a variable voltage charger BATTERY INSPECTION AND CHARGING TT R125E TT R125LWE ...
Страница 113: ...3 41 INSP ADJ Charging method using a constant voltage charger BATTERY INSPECTION AND CHARGING TT R125E TT R125LWE ...
Страница 116: ...INSP ADJ FUSE INSPECTION TT R125E TT R125LWE ...
Страница 139: ...4 23 ENG CAMSHAFT AND ROCKER ARMS 5 Install Camshaft bearing holder 1 Bolt 2 T R 10 Nm 1 0 m kg 7 2 ft lb LT ...
Страница 288: ......