6 - 19
–
+
ELEC
CHARGING SYSTEM (TT-R125E/TT-R125LWE)
EC624000
COUPLERS AND LEADS CONNECTION
INSPECTION
1. Check:
●
Couplers and leads connection
Rust/dust/looseness/short-circuit
→
Repair or replace.
CHARGING VOLTAGE INSPECTION
1. Start the engine.
2. Inspect:
●
Charging voltage
Out of specification
→
If no failure is
found in checking the source coil resis-
tance, replace the rectifier/regulator.
Tester (+) lead
→
Red lead
1
Tester (–) lead
→
Black lead
2
Charging
voltage
Tester selector
position
14.0 ~ 15.0 V at
5,000 r/min
DCV-20
W
B
R
Y
2
1
3. Inspect:
●
Charging coil resistance
Out of specification
→
Replace.
Tester (+) lead
→
White lead
1
Tester (–) lead
→
Black lead
2
Charging coil
resistance
Tester selector
position
0.64 ~ 0.96
Ω
at
20 ˚C (68 ˚F)
Ω
×
1
W Sb
Y B
1
2
Содержание TT-R125E(W)
Страница 2: ......
Страница 14: ...MEMO ...
Страница 64: ......
Страница 67: ......
Страница 69: ......
Страница 70: ...1 2 3 4 5 6 7 8 9 0 6 6 C B D F G E A B C D E F G J K L M N H ...
Страница 112: ...3 40 INSP ADJ Charging method using a variable voltage charger BATTERY INSPECTION AND CHARGING TT R125E TT R125LWE ...
Страница 113: ...3 41 INSP ADJ Charging method using a constant voltage charger BATTERY INSPECTION AND CHARGING TT R125E TT R125LWE ...
Страница 116: ...INSP ADJ FUSE INSPECTION TT R125E TT R125LWE ...
Страница 139: ...4 23 ENG CAMSHAFT AND ROCKER ARMS 5 Install Camshaft bearing holder 1 Bolt 2 T R 10 Nm 1 0 m kg 7 2 ft lb LT ...
Страница 288: ......