SPEC
2 - 14
MAINTENANCE SPECIFICATIONS
NOTE:
- marked portion shall be checked for torque tightening after break-in or before each ride.
Cylinder head tightening sequence
Segment
M6
×
1.0
1
12
1.2
8.7
Stopper lever
M6
×
1.0
1
10
1.0
7.2
Part to be tightened
Thread size
Q’ty
Tightening torque
Nm
m•kg
ft•lb
Содержание TT-R125E(W)
Страница 2: ......
Страница 14: ...MEMO ...
Страница 64: ......
Страница 67: ......
Страница 69: ......
Страница 70: ...1 2 3 4 5 6 7 8 9 0 6 6 C B D F G E A B C D E F G J K L M N H ...
Страница 112: ...3 40 INSP ADJ Charging method using a variable voltage charger BATTERY INSPECTION AND CHARGING TT R125E TT R125LWE ...
Страница 113: ...3 41 INSP ADJ Charging method using a constant voltage charger BATTERY INSPECTION AND CHARGING TT R125E TT R125LWE ...
Страница 116: ...INSP ADJ FUSE INSPECTION TT R125E TT R125LWE ...
Страница 139: ...4 23 ENG CAMSHAFT AND ROCKER ARMS 5 Install Camshaft bearing holder 1 Bolt 2 T R 10 Nm 1 0 m kg 7 2 ft lb LT ...
Страница 288: ......