6 - 12
–
+
ELEC
CLUTCH SWITCH INSPECTION
1. Inspect:
●
Clutch switch continuity
No continuous while being pulled
→
Replace.
Continuous while being freed
→
Replace.ß
Tester (+) lead
→
Black lead
1
Tester (–) lead
→
Black lead
2
B
1
B
2
Tester selec-
tor position
PULL
Ω
×
1
FREE
B
B
1
2
START SWITCH INSPECTION
1. Inspect:
●
Start switch continuity
No continuous while being pushed
→
Replace.
Continuous while being freed
→
Replace.
Tester (+) lead
→
Black lead
1
Tester (–) lead
→
Black lead
2
B
1
B
2
Tester selec-
tor position
PUSH IN
Ω
×
1
FREE
B
B
1 2
ELECTRIC STARTING SYSTEM (TT-R125E/TT-R125LWE)
Содержание TT-R125E(W)
Страница 2: ......
Страница 14: ...MEMO ...
Страница 64: ......
Страница 67: ......
Страница 69: ......
Страница 70: ...1 2 3 4 5 6 7 8 9 0 6 6 C B D F G E A B C D E F G J K L M N H ...
Страница 112: ...3 40 INSP ADJ Charging method using a variable voltage charger BATTERY INSPECTION AND CHARGING TT R125E TT R125LWE ...
Страница 113: ...3 41 INSP ADJ Charging method using a constant voltage charger BATTERY INSPECTION AND CHARGING TT R125E TT R125LWE ...
Страница 116: ...INSP ADJ FUSE INSPECTION TT R125E TT R125LWE ...
Страница 139: ...4 23 ENG CAMSHAFT AND ROCKER ARMS 5 Install Camshaft bearing holder 1 Bolt 2 T R 10 Nm 1 0 m kg 7 2 ft lb LT ...
Страница 288: ......