5 - 69
CHAS
4. Install:
TT-R125LWE
●
Rear shock absorber assembly sub-
tank
1
●
Screw clamp
2
●
Locking tie
3
NOTE:
●
Install the rear shock absorber assembly
sub-tank so that its bottom portion directs as
shown and lightly touches the projection
a
on the frame.
●
Install the rear shock absorber assembly
sub-tank with a clearance
b
between the
sub-tank and frame.
●
Fasten the sub-tank hose with the locking tie.
Refer to “CABLE ROUTING DIAGRAM” sec-
tion in the CHAPTER 2.
1
3
a
T
R
.
.
4 Nm (0.4 m · kg, 2.9 ft · lb)
b
= 0~2 mm
(0~0.08 in)
2
REAR SHOCK ABSORBER ASSEMBLY
Содержание TT-R125E(W)
Страница 2: ......
Страница 14: ...MEMO ...
Страница 64: ......
Страница 67: ......
Страница 69: ......
Страница 70: ...1 2 3 4 5 6 7 8 9 0 6 6 C B D F G E A B C D E F G J K L M N H ...
Страница 112: ...3 40 INSP ADJ Charging method using a variable voltage charger BATTERY INSPECTION AND CHARGING TT R125E TT R125LWE ...
Страница 113: ...3 41 INSP ADJ Charging method using a constant voltage charger BATTERY INSPECTION AND CHARGING TT R125E TT R125LWE ...
Страница 116: ...INSP ADJ FUSE INSPECTION TT R125E TT R125LWE ...
Страница 139: ...4 23 ENG CAMSHAFT AND ROCKER ARMS 5 Install Camshaft bearing holder 1 Bolt 2 T R 10 Nm 1 0 m kg 7 2 ft lb LT ...
Страница 288: ......