7 - 23
DRIV
I
J
K
E
H
4
G
1
M
N
(4)
(11)
O
P
R
Q
L
2
D
C
B
A
8
5
7
9
0
F
4
3
6
New
New
New
New
New
New
New
New
T
R
.
.
23 Nm (2.3 m
•
kg, 17 ft
•
Ib)
T
R
.
.
23 Nm (2.3 m
•
kg, 17 ft
•
Ib)
T
R
.
.
23 Nm (2.3 m
•
kg, 17 ft
•
Ib)
T
R
.
.
23 Nm (2.3 m
•
kg, 17 ft
•
Ib)
T
R
.
.
10 Nm (1.0 m
•
kg, 7.2 ft
•
Ib)
LS
G
G
G
G
LS
LS
LS
G
G
LS
LT
Order
Job/Part
Q’ty
Remarks
O
Expander
1
Refer to “DISASSEMBLING THE FINAL
DRIVE PINION GEAR ASSEMBLY” and
“ASSEMBLING THE FINAL DRIVE PIN-
ION GEAR ASSEMBLY”.
P
Washer
1
Q
Bearing
1
R
Final drive pinion gear bearing housing
1
For assembly, reverse the disassembly
procedure.
REAR CONSTANT VELOCITY JOINTS AND FINAL
DRIVE GEAR
Содержание GRIZZLY 700 FI YFM7FGPW
Страница 1: ...LIT 11616 20 11 3B4 28197 10 YFM7FGPW SERVICE MANUAL ...
Страница 47: ...2 11 SPEC ENGINE SPECIFICATIONS Cylinder head tightening sequence 3 1 4 2 7 8 5 6 ...
Страница 274: ...6 2 FI FUEL INJECTION SYSTEM 6 ...
Страница 482: ...10 7 TRBL SHTG ...
Страница 484: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN PRINTED IN U S A ...