0
1
2
3
4
5
6
7
8
9
10
A
PTT unit ............................................................................ 9-33
Removing the PTT unit ............................................................ 9-34
Checking the hydraulic pressure ............................................. 9-35
Bleeding the PTT unit .............................................................. 9-37
Installing the PTT unit .............................................................. 9-39
PTT cylinder ..................................................................... 9-41
Removing the tilt ram and trim ram ......................................... 9-43
Disassembling the tilt ram ....................................................... 9-44
Disassembling the trim ram ..................................................... 9-44
Checking the tilt cylinder and trim cylinder .............................. 9-44
Checking the absorber valve ................................................... 9-44
Assembling the tilt ram ............................................................ 9-44
Assembling the trim ram .......................................................... 9-45
Installing the trim ram .............................................................. 9-46
Installing the tilt ram ................................................................ 9-46
PTT motor ........................................................................ 9-48
Removing the reservoir ........................................................... 9-50
Removing the PTT motor ........................................................ 9-50
Disassembling the PTT motor ................................................. 9-50
Checking the armature (PTT motor) ........................................ 9-51
Checking the brush ................................................................. 9-51
Checking the reservoir ............................................................ 9-52
Assembling the PTT motor ...................................................... 9-52
Installing the PTT motor .......................................................... 9-53
Installing the reservoir ............................................................. 9-53
PTT gear pump ................................................................ 9-54
Removing the gear pump assembly ........................................ 9-57
Disassembling the gear pump housing ................................... 9-57
Disassembling the gear pump ................................................. 9-57
Checking the gear pump ......................................................... 9-58
Checking the gear pump housing ............................................ 9-58
Checking the valve seal .......................................................... 9-58
Checking the filter .................................................................... 9-58
Assembling the gear pump ...................................................... 9-59
Assembling the gear pump housing ........................................ 9-60
Installing the gear pump assembly .......................................... 9-61
Содержание F150A
Страница 1: ...SERVICE MANUAL 63P 28197 3P 12 F150A FL150A F150B FL150B ...
Страница 4: ......
Страница 48: ...2 3 Electronic control system Engine ECM component 2 3 4 6 5 1 8 7 10 9 11 12 14 15 16 13 17 ...
Страница 110: ...3 41 Propeller selection MEMO ...
Страница 129: ...4 18 Outboard motor troubleshooting MEMO ...
Страница 175: ...5 44 PTT system 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 247: ...7 22 Starter motor Terminal nut 3 9 N m 0 9 kgf m 6 6 ft lb ...
Страница 385: ...8 78 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 434: ...9 47 PTT cylinder Cylinder end screw wrench 2 90890 06591 Tilt cylinder end screw 1 150 N m 15 0 kgf m 110 6 ft lb 1 2 ...
Страница 449: ...9 62 PTT gear pump 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 474: ...i 8 Index 0 1 2 3 5 6 7 8 9 10 10 A MEMO ...
Страница 475: ......
Страница 476: ...Oct 2011 2 ABE E ...