9-19
Upper case
7.
Install a new gasket “1” and the drain bolt
“2”, and then tighten the drain bolt “2” to
the specified torque.
Baffle plate screw “3”:
4 N·m (0.4 kgf·m, 3.0 ft·lb)
Oil pan assembly bolt (M8) “10”:
20 N·m (2.0 kgf·m, 14.8 ft·lb)
Oil pan assembly bolt (M10) “11”:
42 N·m (4.2 kgf·m, 31.0 ft·lb)
Drain bolt “2”: 28 N·m (2.8 kgf·m, 20.7 ft·lb)
1
2
3
4
4
5
6
7
8
9
9
10
11
a
1
2
Содержание F150A
Страница 1: ...SERVICE MANUAL 63P 28197 3P 12 F150A FL150A F150B FL150B ...
Страница 4: ......
Страница 48: ...2 3 Electronic control system Engine ECM component 2 3 4 6 5 1 8 7 10 9 11 12 14 15 16 13 17 ...
Страница 110: ...3 41 Propeller selection MEMO ...
Страница 129: ...4 18 Outboard motor troubleshooting MEMO ...
Страница 175: ...5 44 PTT system 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 247: ...7 22 Starter motor Terminal nut 3 9 N m 0 9 kgf m 6 6 ft lb ...
Страница 385: ...8 78 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 434: ...9 47 PTT cylinder Cylinder end screw wrench 2 90890 06591 Tilt cylinder end screw 1 150 N m 15 0 kgf m 110 6 ft lb 1 2 ...
Страница 449: ...9 62 PTT gear pump 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 474: ...i 8 Index 0 1 2 3 5 6 7 8 9 10 10 A MEMO ...
Страница 475: ......
Страница 476: ...Oct 2011 2 ABE E ...