6-20
Canister and vapor shut-off valve
0
1
2
3
4
5
6
7
8
9
10
A
2.
Connect the vapor gas hoses “3” and “4”,
and then fasten them using the plastic
ties “5”.
3.
Install the vaper gas hose “4” to the
holder “6”.
4.
Connect the vapor gas hoses “1”, “2”,
and “3”, and then fasten them using the
plastic ties “4”.
5.
Connect the vapor gas hose “1”, and
then fasten it using the plastic tie “2”.
6.
Connect the vapor gas hose “3”, and
then fasten it using the clamp “4”.
7.
Install the vapor gas hose “5” to the
holder “6”.
8.
Install the spark plug wires to the hold-
ers.
4
6
1
1
5
3
2
3
4
4
1
2
3
5
2 4
6
1
Содержание F150A
Страница 1: ...SERVICE MANUAL 63P 28197 3P 12 F150A FL150A F150B FL150B ...
Страница 4: ......
Страница 48: ...2 3 Electronic control system Engine ECM component 2 3 4 6 5 1 8 7 10 9 11 12 14 15 16 13 17 ...
Страница 110: ...3 41 Propeller selection MEMO ...
Страница 129: ...4 18 Outboard motor troubleshooting MEMO ...
Страница 175: ...5 44 PTT system 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 247: ...7 22 Starter motor Terminal nut 3 9 N m 0 9 kgf m 6 6 ft lb ...
Страница 385: ...8 78 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 434: ...9 47 PTT cylinder Cylinder end screw wrench 2 90890 06591 Tilt cylinder end screw 1 150 N m 15 0 kgf m 110 6 ft lb 1 2 ...
Страница 449: ...9 62 PTT gear pump 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 474: ...i 8 Index 0 1 2 3 5 6 7 8 9 10 10 A MEMO ...
Страница 475: ......
Страница 476: ...Oct 2011 2 ABE E ...