9-5
Shift rod and shift bracket
3.
Install a new O-ring “1” to the shift rod
assembly “2”.
4.
Install the grommet “3” to the upper case.
5.
Install the shift lever “4” to the set pin “a”
of the shift rod assembly “2”.
6.
Install the dowel “5” and shift rod assem-
bly “2”, and then align the center of the
set pin “a” with the mark “b” on the bot-
tom cowling.
7.
Install the washer “1” and shift bracket
assembly “2”, and then install the bush-
ing “3” and clip “4” to the shift lever “5”.
Shift rod detent bolt “6”:
18 N·m (1.8 kgf·m, 13.3 ft·lb)
1
3
4
5
6
2
2
4
2
a
a
b
5
1
3
5
2
3
4
1
Содержание F150A
Страница 1: ...SERVICE MANUAL 63P 28197 3P 12 F150A FL150A F150B FL150B ...
Страница 4: ......
Страница 48: ...2 3 Electronic control system Engine ECM component 2 3 4 6 5 1 8 7 10 9 11 12 14 15 16 13 17 ...
Страница 110: ...3 41 Propeller selection MEMO ...
Страница 129: ...4 18 Outboard motor troubleshooting MEMO ...
Страница 175: ...5 44 PTT system 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 247: ...7 22 Starter motor Terminal nut 3 9 N m 0 9 kgf m 6 6 ft lb ...
Страница 385: ...8 78 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 434: ...9 47 PTT cylinder Cylinder end screw wrench 2 90890 06591 Tilt cylinder end screw 1 150 N m 15 0 kgf m 110 6 ft lb 1 2 ...
Страница 449: ...9 62 PTT gear pump 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 474: ...i 8 Index 0 1 2 3 5 6 7 8 9 10 10 A MEMO ...
Страница 475: ......
Страница 476: ...Oct 2011 2 ABE E ...