9-8
PTT switch and cowling lock lever
0
1
2
3
4
5
6
7
8
9
10
A
Removing the PTT switch
1.
Remove the holder “1”, and then remove
the PTT switch “2”.
A. Regular rotation model
B. Counter rotation model
Removing the cowling lock lever
1.
Remove the spring “1”.
2.
Remove the lever “1” and cowling lock
lever “2”.
Removing the flushing hose
1.
Remove the adapter “1” and hose joints
“2”, and “3”.
2.
Remove the flushing hose “1”, PTT motor
leads “a”, trim sensor lead “b”, and grom-
met “2”.
Installing the flushing hose
1.
Install the grommet “1” to the bottom
cowling.
STBD
1
2
A
PORT
1
2
B
1
1
2
1
2
3
2
a
b
1
Содержание F150A
Страница 1: ...SERVICE MANUAL 63P 28197 3P 12 F150A FL150A F150B FL150B ...
Страница 4: ......
Страница 48: ...2 3 Electronic control system Engine ECM component 2 3 4 6 5 1 8 7 10 9 11 12 14 15 16 13 17 ...
Страница 110: ...3 41 Propeller selection MEMO ...
Страница 129: ...4 18 Outboard motor troubleshooting MEMO ...
Страница 175: ...5 44 PTT system 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 247: ...7 22 Starter motor Terminal nut 3 9 N m 0 9 kgf m 6 6 ft lb ...
Страница 385: ...8 78 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 434: ...9 47 PTT cylinder Cylinder end screw wrench 2 90890 06591 Tilt cylinder end screw 1 150 N m 15 0 kgf m 110 6 ft lb 1 2 ...
Страница 449: ...9 62 PTT gear pump 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 474: ...i 8 Index 0 1 2 3 5 6 7 8 9 10 10 A MEMO ...
Страница 475: ......
Страница 476: ...Oct 2011 2 ABE E ...