9-61
PTT gear pump
8.
Install the spacers “1” and “2”, the port
plugs “3”, and new O-rings “4” and “5”.
Installing the gear pump assembly
Lubricate the parts using ATF Dexron II dur-
ing assembly.
When assembling the PTT unit, do not use
a rag. Otherwise, dust and particles could
get on the PTT unit components, causing
poor performance.
1.
Install the gear pump assembly “1”, pro-
tection valves “2” and “3”, wave washer
“4”, backup ring “5”, filter “6”, and plate
“7”, and then tighten the gear pump bolt
“8” to the specified torque.
Plug “2”: 4 N·m (0.4 kgf·m,, 3.0 ft·lb)
1
2
4
4
5
2
1
3
Gear pump bolt “8”:
7 N·m (0.7 kgf·m, 5.2 ft·lb)
7
8
8
6
5
4
2
3
1
Содержание F150A
Страница 1: ...SERVICE MANUAL 63P 28197 3P 12 F150A FL150A F150B FL150B ...
Страница 4: ......
Страница 48: ...2 3 Electronic control system Engine ECM component 2 3 4 6 5 1 8 7 10 9 11 12 14 15 16 13 17 ...
Страница 110: ...3 41 Propeller selection MEMO ...
Страница 129: ...4 18 Outboard motor troubleshooting MEMO ...
Страница 175: ...5 44 PTT system 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 247: ...7 22 Starter motor Terminal nut 3 9 N m 0 9 kgf m 6 6 ft lb ...
Страница 385: ...8 78 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 434: ...9 47 PTT cylinder Cylinder end screw wrench 2 90890 06591 Tilt cylinder end screw 1 150 N m 15 0 kgf m 110 6 ft lb 1 2 ...
Страница 449: ...9 62 PTT gear pump 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Страница 474: ...i 8 Index 0 1 2 3 5 6 7 8 9 10 10 A MEMO ...
Страница 475: ......
Страница 476: ...Oct 2011 2 ABE E ...