Operation
Multi 3410
45
ba75863y18
01/2015
Calibration evaluation
After calibrating, the meter automatically evaluates the calibration. The
zero point and slope are evaluated separately. The worse evaluation of
both is taken into account. The evaluation appears on the display and
in the calibration record.
Note
For pH IDS sensors, you can optionally enable a more finely graded
calibration evaluation (QSC) (see section 4.6.10).
Preparatory activities
Perform the following preparatory activities when you want to calibrate:
4.6.5
Calibration interval
The calibration evaluation is displayed as a sensor symbol.
After the QSC function has been enabled the sensor symbol is
replaced by the QSC color scale (see section 4.6.10).
After the specified calibration interval has expired, the sensor symbol
Display
Calibration
record
Zero point
[mV]
Slope
[mV/pH]
+++
-15 ... +15
-60.5 ... -58
++
-20 ... +20
-58 ... -57
+
-25 ... +25
-61 ... -60.5
or
-57 ... -56
-
-30 ... +30
-62 ... -61
or
-56 ... -50
Clean the IDS sensor according to the
sensor operating manual
Error
Error
< -30 or
> 30
... -62 or
... -50
Eliminate the error according to chapter
6 W
1
Connect the IDS pH sensor to the meter.
The pH measuring window is displayed.
2
Keep the buffer solutions ready.
Содержание wtw Multi 3410
Страница 1: ...OPERATING MANUAL ba75863e18 01 2015 Multi 3410 DIGITAL METER FOR DIGITAL IDS SENSORS...
Страница 6: ...Multi 3410 6 ba75863y18 01 2015...
Страница 14: ...Multi 3410 Overview 14 ba75863y18 01 2015...
Страница 18: ...Multi 3410 Safety 18 ba75863y18 01 2015...
Страница 22: ...Multi 3410 Commissioning 22 ba75863y18 01 2015 cable 3 3 4 Setting the date and time 3 See section 4 3 4...
Страница 106: ...Multi 3410 Operation 106 ba75863y18 01 2015...
Страница 116: ...Multi 3410 What to do if 116 ba75863y18 01 2015...
Страница 125: ......