1.6.

 

Before Commencing the Installation 

-

 

Before commencing the installation, we recommend that you attach the serial plate (by default, supplied 
with  the  package)  to  the  operating  documentation  (e.g.:  equipment  operations  log,  etc.),  which  is 
subsequently kept for a later maintenance records and servicing. 

-

 

Before starting any installation or maintenance work, the power must be switched off and 
the main switch secured against being switched on again. 

-

 

Verify that the electrical supply meets the requirements for the curtain power supply (voltage, current, 
etc.) listed on the unit's name plate, see Chapter 3.10. 
 

2.

 

Technical parameters 
2.1.

 

Breeze air curtain design 

 

 

 

 

 

 

 

 

2.1.1.

 

AC axial fan 

-

 

Metal  fan  in  Al/Zn  socket.  Maximum  operating  temperature  of  the  fan  motor  is  +  60°C,  operating 
humidity 0-90% non-condensing, degree of protection IP20 according to the selected type of curtain, 
motor insulation class F. 

2.1.2.

 

 Water heat exchanger - 

BR1-xx-ACV1S-xxx

 

-

 

Maximum  permissible  temperature/pressure  of  the  heating  medium  120°C  /  1,6 MPa.  1-row  heat 
exchanger consists of an aluminium-copper structure. The water heat exchanger is connected by means 
of connection collectors terminated with 1/2" male thread.  

2.1.3.

 

 Electric bodies

 – BR1-xx-ACE1S-xxx

 

-

 

The electrical bodies are designed with PTC cells. This means that the body adapts its power depending 
on the heat removal from its surface. The surface temperature of the body is always the same and is 
independent of the temperature of the blowing air. This ensures approximately the same 

Δt

regardless of 

the set flow rate. Each electrical unit assembly is equipped with safety thermostats (with automatic reset 
at 50°C and manual reset at 75°C) to provide protection against overheating, whereby if necessary the 
electrical exchanger will be disconnected

 

2.1.4.

 

Curtain shroud 

-

 

The curtain shroud is made of galvanized sheet metal with a thickness of 0.8 mm powder coated with RAL 
9003 or RAL 7016 - depending on the selected colour variant of the curtain.  

2.1.5.

 

 Curtain sidewall / regulation cover 

-

 

The sidewall of the curtain is made of galvanized sheet metal with a thickness of 0.8 mm, powder coated 
with RAL 9003 or RAL 7016 - depending on the selected colour variant of the curtain. The sidewall located 
at the main switch is also a regulation cover (marked with a "lightning” warning sign) 

2.1.6.

 

 Intake cover / filter 

-

 

The intake cover is made of galvanized perforated (expanded) sheet metal powder coated with RAL 9003 
or RAL 7016 - depending on the selected colour variant of the curtain. The inlet cover also acts as a coarse 
pre-filter to capture large dust particles, thus protecting the internal components of the curtain (heat 
exchanger, fans...) 

AC AXIAL FAN 

ELECTRIC HEAT 
EXCHANGER 

SUCTION COVER / FILTER 

WATER-TYPE HEAT 
EXCHANGER 

EXHAUST VANES 

MAIN SWITCH 

SIDE  WALLS  /  REGULATION 
COVER 

CURTAIN SHROUD 

Fig. 1 

REGULATION 

M6x20 SCREW 

Содержание Breeze BR-15

Страница 1: ...1 Version 1 GBR 11 05 2022 D 502 0260 OPERATING AND INSTALLATION INSTRUCTIONS FOR THE COMMERCIAL BREEZE AIR CURTAIN...

Страница 2: ...2 1 8 Regulation 8 2 1 9 Main switch 8 2 1 10 M6x20 bolts 8 2 2 Main dimensions and minimum working space requirements of the Breeze air curtain 9 2 3 Technical parameters of Breeze air curtains 9 2...

Страница 3: ...7 1 Preparation of curtains before chaining 22 3 7 2 Installation of chained curtains 23 3 8 Water type heat exchanger connection 23 3 8 1 Connection of the curtain to the building hot water distribu...

Страница 4: ...2 10 Factory regulation setting 30 4 3 Technical parameters of regulation accessories external elements 30 5 Wiring diagram of the Breeze curtain 31 5 1 Electric version BR1 xx ACE1S xxx 31 5 2 Water...

Страница 5: ...installation site keep it for future use It is forbidden to interfere in any way with the curtain internal connection other than as specified in this manual Due to the continuous development of our pr...

Страница 6: ...e for damage caused by improper use of the curtain The user bears the risk 1 4 Transport Delivery Control and Storage 1 4 1 Transport During transport keep the product in the position indicated by the...

Страница 7: ...its power depending on the heat removal from its surface The surface temperature of the body is always the same and is independent of the temperature of the blowing air This ensures approximately the...

Страница 8: ...n is solved in the chapter according to the selected installation position 2 1 8 Regulation The main power cable connection point and control peripherals Description of the regulation and elements con...

Страница 9: ...BR 11 05 2022 D 502 0260 2 2 Main dimensions and minimum working space requirements of the Breeze air curtain 2 3 Technical parameters of Breeze air curtains 2 3 1 BREEZE 15 2 3 2 BREEZE 20 Fig 4 Tab...

Страница 10: ...EZE 25 EC Declaration of Conformity the current and full version of the EC Declaration of Conformity can be found on our website www xvent cz in the Breeze product documents 2 4 Technical data of wate...

Страница 11: ...trical safety before installation of the curtain before starting any installation work the power supply to the prepared wiring must be switched off for commissioning of the unit During the installatio...

Страница 12: ...heated space and at the same time the indoor space is completely separated shielded from the outdoor space 3 1 5 Minimum safety distances from combustible substances the minimum safety distance from...

Страница 13: ...connection to the main electrical supply and the piping depending on the version chosen within the layout possibilities where the curtain is installed 3 2 1 1 Top curtain connection from the ceiling...

Страница 14: ...ation at the bottom at the floor The base mounting procedure is the same as for the top connection see Chapter 3 2 1 1 3 2 2 Placing the curtain in the working position 3 2 2 1 Top curtain connection...

Страница 15: ...the main switch is located on the shroud Connect the power supply and the controls of the curtain door contact actuator on the water version according to Chapter 3 9 Route the main supply line throug...

Страница 16: ...eight of 4 m By chaining connecting the curtains to each other it is possible to create an optimum assembly for the correct shielding of the required opening based on its dimensions The correct height...

Страница 17: ...tain so that of the connecting piece protrudes above the anchored curtain Use 4x self tapping screws 3 5x9 5 included in the connecting piece package to mount the connecting piece Lift the curtain to...

Страница 18: ...the assembly o Always install the BREEZE HINGE set included in the curtain package to the top curtain in all 4 anchor points Choose the appropriate method and fasteners for anchoring the curtain accor...

Страница 19: ...tain exhaust must always be tangent to the shielded opening For further explanation see Chapter 3 7 3 6 2 Auxiliary anchoring structures Prepare suitable auxiliary anchoring structures brackets thread...

Страница 20: ...ot included in the delivery of BREEZE HINGE accessories Lift the partially unpacked curtain according to 3 5 1 with suitable handling equipment e g forklift truck to the prepared installation location...

Страница 21: ...only after they are anchored to the wall or ceiling By chaining connecting the curtains next to each other it is possible to create an optimum set for the correct shielding of the required opening ba...

Страница 22: ...n so that of the connecting piece protrudes towards the next curtain to be chained Use 4x self tapping screws 3 5x9 5 included in the connecting piece package to mount the connecting piece CURTAIN PRE...

Страница 23: ...of the water heat exchanger to tighten the pipe to be connected to the curtain This prevents the exchanger outlets from twisting which can result in irreversible damage to the water exchanger 3 8 3 Ex...

Страница 24: ...Power connection and curtain control Before mounting in the working position consider the possibility of connection to power and controls including the possibility of adjusting the curtain functional...

Страница 25: ...the size of the shielded opening see 4 2 8 1 adjustment of the shielding performance according to the size of the shielded opening Terminal marked as L vent connects the fans to the selected shieldin...

Страница 26: ...ains connection Only qualified persons with valid authorization and knowledge of the relevant standards and directives may carry out the wiring and electrical installation of the curtains Before start...

Страница 27: ...gulation enables o setting the shielding level see 4 2 8 1 according to the size of the shielded opening taking into account local conditions Factory setting for the shielding level 1 designed for a c...

Страница 28: ...and receiver synchronization If you have not managed to pair within 1 min the LED on the receiver is lit Repeat the procedure 4 2 5 Curtain switch off delay device It is used to set the delay of the...

Страница 29: ...or designer 4 2 8 2 Setting of delayed curtain switching off Setting of delayed curtain switching off is used to optimise the operation of the curtain the noise comfort of persons in the shielded room...

Страница 30: ...ture is higher than the thermostat setpoint o the door is open the fans are running at the required shielding level Chapter 4 2 8 1 the door opening is shielded the valve is closed electric heaters ar...

Страница 31: ...31 Version 1 GBR 11 05 2022 D 502 0260 5 Wiring diagram of the Breeze curtain 5 1 Electric version BR1 xx ACE1S xxx...

Страница 32: ...32 Version 1 GBR 11 05 2022 D 502 0260 5 2 Water version BR1 xx ACV1S xxx...

Страница 33: ...33 Version 1 GBR 11 05 2022 D 502 0260 5 3 Unheated version BR1 xx ACS0S xxx...

Страница 34: ...34 Version 1 GBR 11 05 2022 D 502 0260 5 4 Example of chained curtains wiring The door contact chaining is shown by the bold dashed line...

Страница 35: ...Otherwise there is a risk of burns and injuries from rotating parts 7 1 Regular maintenance Regular inspection of the curtain especially the water exchanger is recommended every 500 hours of curtain o...

Страница 36: ...AP IT FROM THE SCREW DETAIL OF THE SNAPPED COVER THERE IS A SLOT ON THE COVER 3 VACUUM ANY DUST FROM THE COMPONENTS OF THE CURTAIN WATER EXCHANGER ELECTRIC EXCHANGER FAN CLEAN OTHER AVAILABLE FLAT SUR...

Страница 37: ...UM CLEANER FROM BOTH SIDES BE CAREFUL NOT TO DAMAGE THE COVER 5 AFTER CLEANING MOUNT THE INTAKE COVERS BACK FIRST HOOK ON ONE SIDE TO THE SCREWS AND THEN BEND THE COVER TO HOOK IT ON THE OTHER SIDE TH...

Страница 38: ...d down Any service work on the electric system must be carried out by a qualified person Make the electrical connection exactly according to the supplied electrical documentation on request 8 1 Troubl...

Страница 39: ...the batteries must be removed first Flat batteries can be disposed of in collection bins provided by specialist electronics shops or handed over to the relevant organization dealing with the collectio...

Страница 40: ...an unjustified complaint all the costs relating to such complaint shall be borne by the complainant 11 In Conclusion If you have any questions about this product do not hesitate to contact us Contact...

Отзывы: