11
Version 1 – GBR (11/05/2022)
D-502-0260
2.4.2.
BR1-20-ACV1S-xxx
2.4.3.
BR1-25-ACV1S-xxx
3.
Unit Installation
3.1.
General information, recommendations and safety before and during installation of the Breeze air curtain
3.1.1.
Electrical safety before installation of the curtain
-
before starting any installation work, the power supply to the prepared wiring must be switched off
for commissioning of the unit. During the installation, the switch must be secured against being
switched on again.
-
The air curtain may only be installed and assembled by a person with the relevant qualification, who is
equipped with appropriate tools and instruments
Tab. 6
Tab. 7