background image

 

29 

 

Version 1 – GBR (11/05/2022) 

D-502-0260 

4.2.7.

 

Technical parameters of the regulation accessory - part of standard delivery of the curtain 

 

 

 

 

 

 

 

4.2.8.

 

Description of regulation settings 

-

 

Based  on  the  local  situation,  consider  setting  the  regulation  before  placing  it  in  the  final  position

Especially  when  chaining  curtains  and  when  installing  the  regulations  vertically  (towards  the  floor). 
There is a risk of impaired access to curtain function settings. 

-

 

Any settings must be made with the curtain power off - NEVER WHEN THE CURTAIN IS IN OPERATION. 
Electric shock hazard. All the curtain functions is powered by 230 VAC. 
4.2.8.1.

 

Setting the curtain performance according to the size - height of the shielded opening 

-

 

Depending on the size of the shielded opening and the local construction conditions (e.g.: stairway draft), 
select the required shielding level.  

-

 

To  better  understand  the  shielding  level  setting,  you  can  use  the  following  table  (also  located  on  the 
curtain). The table can in no way match the local conditions. These are only recommended values based 
on the ideal conditions. 

-

 

The proposal of the correct shading performance should be defined by an HVAC specialist or designer 

 

 

 

 

 

 

4.2.8.2.

 

Setting of delayed curtain switching-off 

-

 

Setting of delayed curtain switching-off is used to optimise the operation of the curtain, the noise comfort 
of persons in the shielded room and to save costs associated with frequent start-up of fans and heating.  

-

 

The delay time is always counted from the moment the door is closed. If the door is opened while the 
delay is running, the delay is reset and starts again when the door is closed 

-

 

The correct switch-off delay is set according to the average time of passage through the shielded opening. 
The more often someone passes through the shielded opening the longer the time should be set.  

-

 

Example 1. - supermarket entrance - a large number of people passing by 

o

 

The average time of passage through the shielded opening is about every 2 minutes. The delay 
time should be set to about 10 min. 

-

 

Example 2. - entrance to a standard retail store - a low number of people passing by 

o

 

The average time of passage through the shielded opening is about every 30 minutes. Set the delay 
time to about 10 sec (factory setting) 

-

 

Delay setting range is from 1 sec to 20 min 

-

 

The minimum recommended value for delayed switching-off is 5 sec. 

-

 

Always adjust the delay on the curtain when the curtain power is off - NEVER WHILE THE CURTAIN IS IN 
OPERATION 

-

 

Magnetic door contact 

-

 

Wireless room thermostat 

Tab. 11 

Tab. 12 

Tab. 13 

Содержание Breeze BR-15

Страница 1: ...1 Version 1 GBR 11 05 2022 D 502 0260 OPERATING AND INSTALLATION INSTRUCTIONS FOR THE COMMERCIAL BREEZE AIR CURTAIN...

Страница 2: ...2 1 8 Regulation 8 2 1 9 Main switch 8 2 1 10 M6x20 bolts 8 2 2 Main dimensions and minimum working space requirements of the Breeze air curtain 9 2 3 Technical parameters of Breeze air curtains 9 2...

Страница 3: ...7 1 Preparation of curtains before chaining 22 3 7 2 Installation of chained curtains 23 3 8 Water type heat exchanger connection 23 3 8 1 Connection of the curtain to the building hot water distribu...

Страница 4: ...2 10 Factory regulation setting 30 4 3 Technical parameters of regulation accessories external elements 30 5 Wiring diagram of the Breeze curtain 31 5 1 Electric version BR1 xx ACE1S xxx 31 5 2 Water...

Страница 5: ...installation site keep it for future use It is forbidden to interfere in any way with the curtain internal connection other than as specified in this manual Due to the continuous development of our pr...

Страница 6: ...e for damage caused by improper use of the curtain The user bears the risk 1 4 Transport Delivery Control and Storage 1 4 1 Transport During transport keep the product in the position indicated by the...

Страница 7: ...its power depending on the heat removal from its surface The surface temperature of the body is always the same and is independent of the temperature of the blowing air This ensures approximately the...

Страница 8: ...n is solved in the chapter according to the selected installation position 2 1 8 Regulation The main power cable connection point and control peripherals Description of the regulation and elements con...

Страница 9: ...BR 11 05 2022 D 502 0260 2 2 Main dimensions and minimum working space requirements of the Breeze air curtain 2 3 Technical parameters of Breeze air curtains 2 3 1 BREEZE 15 2 3 2 BREEZE 20 Fig 4 Tab...

Страница 10: ...EZE 25 EC Declaration of Conformity the current and full version of the EC Declaration of Conformity can be found on our website www xvent cz in the Breeze product documents 2 4 Technical data of wate...

Страница 11: ...trical safety before installation of the curtain before starting any installation work the power supply to the prepared wiring must be switched off for commissioning of the unit During the installatio...

Страница 12: ...heated space and at the same time the indoor space is completely separated shielded from the outdoor space 3 1 5 Minimum safety distances from combustible substances the minimum safety distance from...

Страница 13: ...connection to the main electrical supply and the piping depending on the version chosen within the layout possibilities where the curtain is installed 3 2 1 1 Top curtain connection from the ceiling...

Страница 14: ...ation at the bottom at the floor The base mounting procedure is the same as for the top connection see Chapter 3 2 1 1 3 2 2 Placing the curtain in the working position 3 2 2 1 Top curtain connection...

Страница 15: ...the main switch is located on the shroud Connect the power supply and the controls of the curtain door contact actuator on the water version according to Chapter 3 9 Route the main supply line throug...

Страница 16: ...eight of 4 m By chaining connecting the curtains to each other it is possible to create an optimum assembly for the correct shielding of the required opening based on its dimensions The correct height...

Страница 17: ...tain so that of the connecting piece protrudes above the anchored curtain Use 4x self tapping screws 3 5x9 5 included in the connecting piece package to mount the connecting piece Lift the curtain to...

Страница 18: ...the assembly o Always install the BREEZE HINGE set included in the curtain package to the top curtain in all 4 anchor points Choose the appropriate method and fasteners for anchoring the curtain accor...

Страница 19: ...tain exhaust must always be tangent to the shielded opening For further explanation see Chapter 3 7 3 6 2 Auxiliary anchoring structures Prepare suitable auxiliary anchoring structures brackets thread...

Страница 20: ...ot included in the delivery of BREEZE HINGE accessories Lift the partially unpacked curtain according to 3 5 1 with suitable handling equipment e g forklift truck to the prepared installation location...

Страница 21: ...only after they are anchored to the wall or ceiling By chaining connecting the curtains next to each other it is possible to create an optimum set for the correct shielding of the required opening ba...

Страница 22: ...n so that of the connecting piece protrudes towards the next curtain to be chained Use 4x self tapping screws 3 5x9 5 included in the connecting piece package to mount the connecting piece CURTAIN PRE...

Страница 23: ...of the water heat exchanger to tighten the pipe to be connected to the curtain This prevents the exchanger outlets from twisting which can result in irreversible damage to the water exchanger 3 8 3 Ex...

Страница 24: ...Power connection and curtain control Before mounting in the working position consider the possibility of connection to power and controls including the possibility of adjusting the curtain functional...

Страница 25: ...the size of the shielded opening see 4 2 8 1 adjustment of the shielding performance according to the size of the shielded opening Terminal marked as L vent connects the fans to the selected shieldin...

Страница 26: ...ains connection Only qualified persons with valid authorization and knowledge of the relevant standards and directives may carry out the wiring and electrical installation of the curtains Before start...

Страница 27: ...gulation enables o setting the shielding level see 4 2 8 1 according to the size of the shielded opening taking into account local conditions Factory setting for the shielding level 1 designed for a c...

Страница 28: ...and receiver synchronization If you have not managed to pair within 1 min the LED on the receiver is lit Repeat the procedure 4 2 5 Curtain switch off delay device It is used to set the delay of the...

Страница 29: ...or designer 4 2 8 2 Setting of delayed curtain switching off Setting of delayed curtain switching off is used to optimise the operation of the curtain the noise comfort of persons in the shielded room...

Страница 30: ...ture is higher than the thermostat setpoint o the door is open the fans are running at the required shielding level Chapter 4 2 8 1 the door opening is shielded the valve is closed electric heaters ar...

Страница 31: ...31 Version 1 GBR 11 05 2022 D 502 0260 5 Wiring diagram of the Breeze curtain 5 1 Electric version BR1 xx ACE1S xxx...

Страница 32: ...32 Version 1 GBR 11 05 2022 D 502 0260 5 2 Water version BR1 xx ACV1S xxx...

Страница 33: ...33 Version 1 GBR 11 05 2022 D 502 0260 5 3 Unheated version BR1 xx ACS0S xxx...

Страница 34: ...34 Version 1 GBR 11 05 2022 D 502 0260 5 4 Example of chained curtains wiring The door contact chaining is shown by the bold dashed line...

Страница 35: ...Otherwise there is a risk of burns and injuries from rotating parts 7 1 Regular maintenance Regular inspection of the curtain especially the water exchanger is recommended every 500 hours of curtain o...

Страница 36: ...AP IT FROM THE SCREW DETAIL OF THE SNAPPED COVER THERE IS A SLOT ON THE COVER 3 VACUUM ANY DUST FROM THE COMPONENTS OF THE CURTAIN WATER EXCHANGER ELECTRIC EXCHANGER FAN CLEAN OTHER AVAILABLE FLAT SUR...

Страница 37: ...UM CLEANER FROM BOTH SIDES BE CAREFUL NOT TO DAMAGE THE COVER 5 AFTER CLEANING MOUNT THE INTAKE COVERS BACK FIRST HOOK ON ONE SIDE TO THE SCREWS AND THEN BEND THE COVER TO HOOK IT ON THE OTHER SIDE TH...

Страница 38: ...d down Any service work on the electric system must be carried out by a qualified person Make the electrical connection exactly according to the supplied electrical documentation on request 8 1 Troubl...

Страница 39: ...the batteries must be removed first Flat batteries can be disposed of in collection bins provided by specialist electronics shops or handed over to the relevant organization dealing with the collectio...

Страница 40: ...an unjustified complaint all the costs relating to such complaint shall be borne by the complainant 11 In Conclusion If you have any questions about this product do not hesitate to contact us Contact...

Отзывы: