3
Version 1 – GBR (11/05/2022)
D-502-0260
3.1.7.
Curtain alignment ....................................................................................................................................... 12
3.1.8.
Unpacking the curtain - preparation before installation .............................................................................. 12
3.2.
Vertical installation
........................................................................................................................................ 13
3.2.1.
Fixing the curtain base to the floor .............................................................................................................. 13
3.2.1.2.
Bottom curtain connection - from the floor - base (curtain regulation at the bottom - at the floor)............ 14
3.2.2.
Placing the curtain in the working position ................................................................................................. 14
3.3.
Vertical installation - chained curtains
.......................................................................................................... 16
3.3.1.
Installation of chained curtains ................................................................................................................... 16
3.4.
Side anchoring of the chained assembly
....................................................................................................... 18
3.5.
Vertical installation - increasing the shielding effect
.................................................................................... 18
3.6.
Horizontal installation
.................................................................................................................................... 19
3.6.1.
Selecting the installation location ............................................................................................................... 19
3.6.2.
Auxiliary anchoring structures ..................................................................................................................... 19
3.6.3.
Installation of the curtain in a horizontal position ....................................................................................... 19
3.6.4.
Examples of hanging the curtain - horizontal installation ............................................................................ 20
3.6.5.
Mounting-hanging the curtain in the working position ............................................................................... 20
3.7.
Horizontal installation - chaining of curtains
................................................................................................ 21
3.7.1.
Preparation of curtains before chaining ...................................................................................................... 22
3.7.2.
Installation of chained curtains ................................................................................................................... 23
3.8.
Water-type heat exchanger connection
........................................................................................................ 23
3.8.1.
Connection of the curtain to the building hot-water distribution system .................................................... 23
3.8.2.
Water-type heat exchanger connection ...................................................................................................... 23
3.8.3.
Exchanger venting ....................................................................................................................................... 23
3.9.
Wiring and electrical installation
................................................................................................................... 24
3.9.1.
General Information – Safety ...................................................................................................................... 24
3.9.2.
Power connection and curtain control ........................................................................................................ 24
3.9.3.
Wiring and description of power and control terminals .............................................................................. 25
3.9.3.1.
Wiring description of 1 curtain - electric version (BR-xx-ACE1-xxx) ............................................................. 25
3.9.3.2.
Wiring description of 1 curtain - water version (BR-xx-ACV1-xxx) ............................................................... 25
3.9.3.3.
Wiring description of 1 curtain - unheated version (BR-xx-ACS1-xxx) .......................................................... 26
3.9.3.4.
Connecting curtains intended for chaining .................................................................................................. 26
3.9.4.
Mains connection ........................................................................................................................................ 26
3.10.
Electrical parameters shown on the curtain
............................................................................................. 27
4.
Regulation
................................................................................................................................................................................ 27
4.1.
General Information – Safety
......................................................................................................................... 27
4.2.
Description of regulation
............................................................................................................................... 27
4.2.1.
Power control terminals .............................................................................................................................. 28
4.2.2.
receiver of the signal from the wireless room thermostat: ......................................................................... 28
4.2.3.
Wireless room thermostat .......................................................................................................................... 28
4.2.4.
Pairing multiple curtains with a single wireless thermostat ........................................................................ 28