Xtreme Power Conversion Corporation
G90 User’s Manual
Page 43
Uninterruptible Power Supply
5.
If the fuse is blown, replace before reassembling the UPS or EBP.
Testing New Batteries
To test new batteries:
1.
Plug the UPS into a power outlet for 48 hours to completely charge the batteries.
2.
Start up the UPS by pressing the startup combination buttons.
3.
Press the Battery Test combination buttons to activate the battery test. The UPS starts a battery test if
• the batteries are fully charged