Xtreme Power Conversion Corporation
G90 User’s Manual
Page 17
Uninterruptible Power Supply
Verify that the EBP connections are tight and there are adequate bend radiuses and strain relief exists for each
cable.
Step 4
Replace the front covers on the UPS and EBPs, verifying the EBP cables are routed through the EBP cover knock-
outs. Clip the left side of each EBP in place first before connecting the right side. Repeat for each EBP. This is the
same installation procedure as used for the UPS earlier.
Assure that the wires connected between the UPS and EBP are installed behind the front covers and not accessible
to the user.
Rack-mount Installation
Caution:
The UPS and EBPs are heavy. Removing the units from its carton requires a minimum of two people. If in-
stalling optional EBPs, make sure to install the EBPs directly below the UPS so that all wiring between the cabinets
is installed behind the front covers and inaccessible to users.
Note:
Rail Kits are required for each individual UPS and EBP to be installed.
Step 1
Assemble the left and right rails to the rear rails as sown in the diagram below. Do not tighten the screws yet. Ad-
just each rail size for the depth of the rack.
Step 2
Select the proper size in the rack for positioning the UPS. The rail occupies four positions on the front and rear of
the rack.