Installing the Printer
Chapter 1: Getting Started
❖
1-25
32
Plug one end of the 110V GFI (Ground Fault
Interrupt) power cord into the receptacle and
the other end into the wall outlet.
If you do not use the GFI power cord,
Olivetti does not guarantee the
successful operation of your machine.
Go to Step 34.
33
Attach the 220V GFI (Ground Fault Interrupt)
and power cord and plug into AC outlet.
If you do not use the GFI power cord,
Olivetti does not guarantee the
successful operation of your machine.
34
Power ON the printer.
Save all remaining parts, as you may need
them at some later time.
Содержание DP N24
Страница 1: ...DP N24 N32 and N40 Network Laser Printers System Administrator Guide ...
Страница 38: ...Technical Support 1 30 DP N24 N32 and N40 System Administrator Guide ...
Страница 156: ...Reset Menu 3 92 DP N24 N32 and N40 System Administrator Guide ...
Страница 174: ...Using the Hard Disk Drive for Secure and Proof Jobs 5 12 DP N24 N32 and N40 System Administrator Guide ...
Страница 220: ...Print Quality Problems 6 46 DP N24 N32 and N40 System Administrator Guide ...
Страница 221: ...Appendix A DP N40 Ordering Information A 1 DP N40 Ordering Information A p p e n d i x A ...
Страница 224: ...DP N40 Ordering Information A 4 DP N24 N32 and N40 System Administrator Guide ...
Страница 310: ...PostScript Fonts D 6 DP N24 N32 and N40 System Administrator Guide ...
Страница 311: ...Appendix E Printer Specifications E 1 Printer Specifications A p p e n d i x E ...
Страница 314: ...Printer Specifications E 4 DP N24 N32 and N40 System Administrator Guide ...
Страница 322: ...PJL Commands F 8 DP N24 N32 and N40 System Administrator Guide ...