© Copyright 2018 WyreStorm Technologies |
Enado Installation Manual | 180913
35 of 38
UK: +44 (0) 1793 230 343 | ROW: 844.280.WYRE (9973)
Email:
Project & Controller Backup
WyreStorm recommends always keeping a current backup of the Enado controller. To create a full controller backup, perform
the following steps.
1.
Navigate to the Tools menu and select Export/Backup Controller
2.
Allow the Enado to compile the controller backup and then click the download link
To create project backups, perform the following steps.
1.
Navigate to the Project menu and select Export Project to File
2.
Allow the Enado compile the project and then click the download link
Please note: The Export Project to File option will only export the currently selected project. To select a different project for
exporting navigate to the Project menu, hover over Open/Import and then My Projects.
GPIO (Relays & Sensors)
The ENA-001-010 features a set of relays and sensors. These relays can be used for numerous applications such as triggering a
projector screen up or down. The below diagram demonstrates connections from Enado to a projector screen control box.
A closed circuit can be toggled from the Enado UI which will allow 12volts to be sent to the projector screen control box. When
12volts is received, depending on the manufacturer, the screen will go up or down.
To create the relay trigger from the Enado UI perform the following steps.
1.
If not done already, create a button in an Activity Layout.
2.
Select the button and choose Edit Properties.
3.
Next to the Command field, select the Edit (Pencil) icon.
4.
Click the Add Relay Command button.
5.
Choose the appropriate relay and its state, On or Off.