Turb 555 / Turb 555 IR
Operation
33
ba41113e07
04/2009
Connecting the
cuvette shaft
purging
Proceed as follows:
Supply values
Measuring
1 Connect the purging gas source to the fitting (1) on
the back of the instrument using a suitable hose.
2 Turn on the purging gas.
3 Adjust supply values.
Maximum pressure:
4 bar (60 psi)
Recommended flow-
through quantity:
2-5.5 l/min (0.5-1.5 gpm)
1 Provide sample flow.
2 Read the measured value.
3 How to output measured values to the printer or PC
refer to section 4.6.2 O
UTPUT
OF
MEASURED
VALUES
.
Содержание Turb 555
Страница 1: ...ba41113e07 04 2009 Turb 555 Turb 555 IR Operating Manual Turbidity measuring instrument...
Страница 12: ...Safety Turb 555 Turb 555IR 12 ba41113e07 04 2009...
Страница 16: ...Commissioning Turb 555 Turb 555IR 16 ba41113e07 04 2009...
Страница 62: ...Operation Turb 555 Turb 555IR 62 ba41113e07 04 2009...
Страница 66: ...Maintenance cleaning disposal Turb 555 Turb 555IR 66 ba41113e07 04 2009...
Страница 74: ...Technical data Turb 555 Turb 555IR 74 ba41113e07 04 2009...
Страница 81: ......